Analysis of the effect of assembly errors on deviations from design arch sizes
About authors
- 1 — Ph.D., Dr.Sci. professor Petersburg State Transport University
- 2 — Ph.D. associate professor Petersburg State Transport University
Abstract
Arched bridges with suspension brackets of cables are built over the river Ohta in Saint Petersburg and the river Ishim in Astana (Kazakhstan). Each semi-arch was carried out of separate units from supporting block of the arch tightening. There are given the formulas for calculating the precision of semi-arch jointing depending on the fabrication accuracy and dimensions of its elements, on the shape and size of the arch span. Calculation examples are given for the arch bridge construction over the river Ishim in Astana.
Область исследования:
(Archived) Engineering geodesy
Similar articles
Recommendations on the content and periodicity of geodetic control of the crane tracks electric bridge crane
2013 V. G. Potjuchliaev, G. I. Khudiakov
Determining of the parameters of water conducting fracture zone through values of underminen strata horizontal deformations values
2013 V. N. Gusev, D. A. Ilukhin, A. G. Aleksenko