Analysis of the effect of assembly errors on deviations from design arch sizes
About authors
- 1 — Petersburg State Transport University
- 2 — Petersburg State Transport University
Abstract
Arched bridges with suspension brackets of cables are built over the river Ohta in Saint Petersburg and the river Ishim in Astana (Kazakhstan). Each semi-arch was carried out of separate units from supporting block of the arch tightening. There are given the formulas for calculating the precision of semi-arch jointing depending on the fabrication accuracy and dimensions of its elements, on the shape and size of the arch span. Calculation examples are given for the arch bridge construction over the river Ishim in Astana.
Similar articles
Ultrasonic control of the nonlinear elastic properties of the microcrumbling polycrystalline rocks
2013 V. M. Tsaplev, R. M. Ivanyuk, V. V. Zverevich
Development of geomechanical provision room-and-pillar system of rock burst ore deposits at great depths
2013 D. V. Sidorov
Influence percentage value common land on a property on market value of land gardening noncommercial organizations Leningrad’s region
2013 P. M. Demidova, V. G. Gorelikov