Analysis of the effect of assembly errors on deviations from design arch sizes
About authors
- 1 — Petersburg State Transport University
- 2 — Petersburg State Transport University
Abstract
Arched bridges with suspension brackets of cables are built over the river Ohta in Saint Petersburg and the river Ishim in Astana (Kazakhstan). Each semi-arch was carried out of separate units from supporting block of the arch tightening. There are given the formulas for calculating the precision of semi-arch jointing depending on the fabrication accuracy and dimensions of its elements, on the shape and size of the arch span. Calculation examples are given for the arch bridge construction over the river Ishim in Astana.
Similar articles
Prediction of surface settlements duo to construction of underground structures in geological condition of Saint Petersburg
2013 M. A. Karasev
The monitoring methodology tunnels based integrated applications geodetic measurement means and methods of statistical
2013 N. N. Bogomolova
Cadastral valuation methods of specially protected natural areas based conservation value of forest ecosystems
2013 M. V. Neshataev