The method of potash salt interchamber pillars stability control
About authors
- 1 — Ph.D., Dr.Sci. professor Mining institute, Ural branch the Russian Academy of Sciences
- 2 — Ph.D., Dr.Sci. professor Mining institute, Ural branch the Russian Academy of Sciences
- 3 — Ph.D., Dr.Sci. professor Mining institute, Ural branch the Russian Academy of Sciences
Abstract
The research of potash salt rock deforming and damaging features has made it possible to develop the method of load bearing element state examination by chamber-and-pillar system. This method consists in instrumental control of pillars by geophysical and in situ methods with following prognosis of their residual life by mathematical simulation methods.
Область исследования:
(Archived) Innovation in designing of mining plants
Funding:
None
Similar articles
The interaction of the cluster with the determinantsof competitive advantage petrochemical industry of the Omsk region
2013 M. M. Khaikin, V. S. Kudryashov
Ways for providng safety in designing of intensive coal mining at the Kuznetsk basin
2013 A. N. Shabarov, S. V. Tsirel, E. P. Yutyaev, A. I. Paltsev
The proсess of logistization information system as the condition of the effective entry of Russia into the World trade organization
2013 S. V. Ignatieva
Rationale management regime on the companies who develop small deposits
2013 J. G. Roslavtseva, V. P. Fedorko