Submit an Article
Become a reviewer
Vol 207
Pages:
106-109
Download volume:
RUS
Article

Certain periodicity organizational and technical preventive measures, aimed at improving the effective management of safety on coal open pit mining

Authors:
E. B. Gridina1
A. V. Pasynkov2
About authors
  • 1 — Ph.D. associate professor National Mineral Resources University (Mining University)
  • 2 — post-graduate student National Mineral Resources University (Mining University)
Date submitted:
2013-07-09
Date accepted:
2013-09-01
Date published:
2014-03-17

Abstract

Developing preventative preventive measures is one of the key ways to increase the effectiveness of occupational health and safety of miners. Integrated use of probabilistic and expert - analytical methods for analysis of injury, in particular it allows to develop a plan and to deter-mine the frequency of short-term preventive measures.

Область исследования:
(Archived) Industrial safety and health care in mining
Keywords:
safety injuries prevention coal mine a probabilistic method expert-analytical method
Funding:

None

Go to volume 207

References

  1. Ushakov K.Z., Kaledin N.O., Kirin B.F. et al. Life safety: Textbook for Universities. 2nd ed., sr. Moscow: Publ. house of the Moscow State Mining University, 2005. 429 p.
  2. Koch R. The 80/20 / Translated from English D.I.Kapgkan. 2nd ed. Moscow: «Popouri» Ltd, 2004. 352 p.

Similar articles

Prospects of improving technology for development of coalseams in Vietnam’s undergroundmines
2014 Kao Kuok Vet, V. P. Zubov
Interchamber pillars partial working off technology at the floor-and-chamber system of development of the Korobkovsky deposit of KMA
2014 E. I. Boguslavskii, M. N. Andreev
The analysis of the stress-and-strain state in vicinity of mining excavations
2014 A. A. Sankovskii, E. R. Kovalsky
Technology options for the preparation of new horizons
2014 G. A. Kholodnyakov, D. N. Ligotskii
Assessment of the longwall face length influence on gas emission at longwall panels of the OJSC «Vorkutaugol» coal mines
2014 O. I. Kazanin, A. M. Sufiyarov
Physical modeling of interchamber pillars fixity in Gubkin mine
2014 E. I. Boguslavskiy, B. Yu. Zuev, P. V. Korzhavykh