Submit an Article
Become a reviewer
Vol 207
Pages:
81-83
Download volume:
RUS
Article

Technology options for the preparation of new horizons

Authors:
G. A. Kholodnyakov1
D. N. Ligotskii2
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2013-07-13
Date accepted:
2013-09-03
Date published:
2014-03-17

Abstract

The paper considers the advantages and disadvantages of technological options for the training of new horizons in the fields of mineral resources with large water production using excavators such as direct and backhoes.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
opening and preparation of a new horizon water production pulp the bottom of the pit trench and pit parameters
Go to volume 207

Similar articles

Research of technogenic migration of manganese in water objects of the Kovdor area
2014 V. A. Petrova, M. A. Pashkevich
Ways of improving waste disposal in the workings of salt mines
2014 O. V. Kovalev, S. P. Mozer
Quarry capacity of ore relation from bench height
2014 G. A. Kholodnyakov, M. D. Abdullaev
Interchamber pillars partial working off technology at the floor-and-chamber system of development of the Korobkovsky deposit of KMA
2014 E. I. Boguslavskii, M. N. Andreev
Gas balance definition of working area with face zone isolation
2014 V. V. Smirnyakov
Contemporary Problems of salvaging drill cuttings on the Western Siberia oilfields of the final stage of development
2014 V. V. Katsilo