Method of normal load prediction on vertical shaft lining based on nonlinear behaviour of rock mass

Authors:
A. G. Protosenya1
Nguen Ny Bai2
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — post-graduate student National Mineral Resources University (Mining University)
Date submitted:
2013-07-12
Date accepted:
2013-09-22
Date published:
2014-03-17

Abstract

Method of normal load prediction on vertical shaft lining which is constructed in nonlinear rock mass is suggested. It is supposed, that limit state zone is formed around excavation. The deformation properties of rock mass in the suggested method are determined according to nonlinear rock model. In order to predict stress and strain state around excavation the equations of deformation plasticity theory are used. The Mohr-Coulomb strength criteria is taken as a yield surface.

Область исследования:
(Archived) Geomechanics
Keywords:
nonlinear plasticity stresses shaft lining rock
Go to volume 207

References

  1. Bulychev N.S., Amusin B.Z., Olovanniy A.G. Liningdesign of permanent excavation. Мoscow: Nedra, 1974. 381 p.
  2. Stavrogin A.N., Protosenya A.G. Plasticity of rocks.Мoscow: Nedra, 1979. 301 p.
  3. Trushko V.L., Protosenya A.G., Matveev P.F.,Sovmen H.M. Geomechanics of rock mass and dynamics of deep ore mines / Saint Petersburg Mining Institute. Saint Petersburg, 2001. 393 p.

Similar articles

Studying of the overgrowth mechanism dumps overburden breeds in climatic conditions of northern regions
2014 V. S. Kuznetsov
Quarry capacity of ore relation from bench height
2014 G. A. Kholodnyakov, M. D. Abdullaev
Rock mechanics problems decision algorithm for bottom layers of potash salt deposits
2014 O. V. Kovalev, S. P. Mozer, I. Yu. Tkhorikov, A. A. Sankovskii
Tracing the forecast structural elements while interpretation of remote sensing data within Fresnillo city (Central Mexica)
2014 I. B. Movchan, V. Yu. Asyanina
Interchamber pillars partial working off technology at the floor-and-chamber system of development of the Korobkovsky deposit of KMA
2014 E. I. Boguslavskii, M. N. Andreev
Optimization of work of dust supperession sprayer with use of computing modelling
2014 Yu. D. Smirnov, O. S. Dobrynin