Submit an Article
Become a reviewer
Vol 34 Iss. 1
Pages:
181-186
Download volume:
RUS
Article

On actual wear of a rope at two-layer winding on a drum of a vertical hoisting installation

Authors:
G. V. Verstakov
Date submitted:
1956-07-05
Date accepted:
1956-09-28
Date published:
1957-03-02

Abstract

Powerful modern hoisting machines perfectly serve mines up to 800 m depth. Lifting machines for mines of greater depth (not counting lifting machines with friction pulleys, which have known disadvantages) should have either drums of larger sizes than currently manufactured, or the possibility of using a two-layer winding on the rope on the drum. New machines, unlike the existing ones, should have less weight and better qualities.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 34

Similar articles

Mechanics of the jaw crusher
1957 P. A. Zhuravlev
Operation mode of the local ventilation fan
1957 S. A. Medvedev
Some remarks on adjustment of braking devices
1957 O. N. Chashnikov
Felix N. Shklyarsky (1883-1955)
1957 S. A. Alatortsev
Theoretical substantiation of design and calculation of cage cam parachutes
1957 N. N. Smirnov
Investigation of the characteristics of pneumatic energy consumers
1957 S. S. Smorodin