Submit an Article
Become a reviewer
Vol 34 Iss. 1
Pages:
80-102
Download volume:
RUS
Article

Theoretical substantiation of design and calculation of cage cam parachutes

Authors:
N. N. Smirnov
Date submitted:
1956-07-07
Date accepted:
1956-09-06
Date published:
1957-03-02

Abstract

The development of reliable safety devices to catch the falling stand at the breakage of the hoisting rope is one of the issues that have not received to date a satisfactory design solution.Development of the design of reliably working parachutes to stop the falling stand is necessary in connection with the transition of mining operations to the development of deep horizons and associated with this increase in the speed of movement of stands.

Область исследования:
(Archived) Without section
Go to volume 34

References

  1. Umansky V. B. Mine hoisting installations, Uglegletehizdat, 1948.
  2. Umansky V. B. To the question of reliability of parachutes for rail conductors. Mining Journal, 1946, No. 11-12.

Similar articles

About actual wear of a rope at two-layer winding on a drum of a vertical hoisting installation
1957 G. V. Verstakov
Some remarks on adjustment of braking devices
1957 O. N. Chashnikov
Operation mode of the local ventilation fan
1957 S. A. Medvedev
Magnitude of train composition at transportation by contact electric locomotives along the main pumping excavations of coal mines
1957 A. M. Faktorovich
Investigation of pneumatic motors energy processes by the method of similarity
1957 V. D. Zinevich
Mechanics of the jaw crusher
1957 P. A. Zhuravlev