Abstract

Cleaning the bottom hole of drilled rock and bringing it to the surface when drilling shafts and boreholes is one of the main functions performed by the flushing fluid. In the process of drilling, the flushing fluid is contaminated with drilled rock and its percentage in the fluid increases. The high content of drilled rock in the flushing fluid deteriorates its quality, causes collapse of the borehole walls (due to deterioration of the clay coating on its walls) and poses a risk of seizing the drilling tool when flushing is stopped. Besides, the increase in the percentage of rock content in the flushing solution requires more energy for flushing, increases the wear of drilling equipment parts, and significantly reduces the drilling speed.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 36

Similar articles

Dependence of specific explosives consumption on the depth of a single ripping charge embedment
1958 Yu. M. Misnik
Optimal parameters of dump trucks for open pit mining
1958 M. E. Gonik
Ways of improvement of the layer caving system with the use of flexible covering
1958 E. Ya. Makhno
Deformation of mine shaft supports in Donbass and measures to combat it
1958 V. N. Mankov
Determination of air losses and calculation of depression in parallel workings
1958 M. A. Patrushev
Dynamic coefficient for the calculation of rigid shaft equipment in mine shafts
1958 T. A. Ponomareva