Trenching speeds depending on ledge height and sinking methods

Authors:
S. Ya. Arsenyev
V. M. Prosochkin
Date submitted:
1965-07-04
Date accepted:
1965-09-13
Date published:
1966-07-26

Abstract

High trenching speeds are necessary to reduce construction time and increase the production capacity of open pits.During normal operation, the speed of trenching depends on the intensity of mining, the length of the mining front, the direction of front movement in relation to the occurrence of the ore body, the height and number of mining ledges that are in simultaneous mining, the width of working sites and other factors and can be determined by the ...

Область исследования:
(Archived) Without section
Go to volume 52

Similar articles

Experience of electrochemical strengthening of clayey rocks at quarries of Tikhvin alumina refinery.
1966 A. G. Khutashvili, V. N. Novozhilov
About energy consumption in the near zone of explosion
1966 A. N. Khanukaev, K. A. Dolgov
Preliminary assessment of expediency of application of open pit operations
1966 M. B. Redkin
Determination of mining parameters for low-capacity ledge development by draglines (on the example of the Kingisepp phosphate deposit)
1966 I. M. Norkin
Calculation of rods and flexible cable ties at artificial strengthening of rock slopes at quarries.
1966 M. A. Revazov, N. K. Zvonarev
Selection of parameters and efficiency of the panel mining system (on the example of the Kingisepp phosphate deposit).
1966 L. G. Tymovsky, I. M. Norkin