Trenching speeds depending on bench and driving methods

Authors:
S. Ya. Arsenyev
V. M. Prosochkin
Date submitted:
1965-07-04
Date accepted:
1965-09-13
Date published:
1966-07-26

Abstract

High trenching speeds are necessary to reduce construction time and increase the production capacity of open pits. During normal operation, the speed of trenching depends on the intensity of mining, the length of the mining front, the direction of front movement in relation to the occurrence of the ore body, the height and number of mining benches that are in simultaneous mining, the width of working benches and other factors and can be determined by the formula ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 52

Similar articles

Protection of constructions from the action of an air shock wave
1966 Yu. A. Yurmanov
Determination of mining parameters for thin bench development by draglines ( using the example of the Kingisepp phosphate deposit)
1966 I. M. Norkin
Influence of the charge diameter on the granite crushing degree
1966 A. A. Sashin
Operational management at open-cut mining worksOperational management at open-cut mining **operations**.
1966 A. D. Shkolnikov
Toward the theory of systems and improvement of open pit mining technology
1966 N. D. Zolotarev
Engineering-geological zoning for estimation of stability of rocks in quarry fields (on the example of Tikhvin mining district)