Trenching speeds depending on ledge height and sinking methods

Authors:
S. Ya. Arsenyev
V. M. Prosochkin
Date submitted:
1965-07-04
Date accepted:
1965-09-13
Date published:
1966-07-26

Abstract

High trenching speeds are necessary to reduce construction time and increase the production capacity of open pits.During normal operation, the speed of trenching depends on the intensity of mining, the length of the mining front, the direction of front movement in relation to the occurrence of the ore body, the height and number of mining ledges that are in simultaneous mining, the width of working sites and other factors and can be determined by the ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 52

Similar articles

Protection of constructions from the action of an air shock wave
1966 Yu. A. Yurmanov
Determination of mining parameters for low-capacity ledge development by draglines (on the example of the Kingisepp phosphate deposit)
1966 I. M. Norkin
Operational management at open-cut mining works
1966 A. D. Shkolnikov
Stability of outcrops in blocks reaching the surface
1966 N. Z. Galaev, Yu. P. Golovin
Investigation of granite drillability of Karelian Isthmus granites by jet burners
1966 V. K. Bubok, A. E. Sigachev, I. Yu. Bukin, V. S. Hanusko
Influence of the charge diameter on the granite crushing degree
1966 A. A. Sashin