Trenching speeds depending on bench and driving methods

Authors:
S. Ya. Arsenyev
V. M. Prosochkin
Date submitted:
1965-07-04
Date accepted:
1965-09-13
Date published:
1966-07-26

Abstract

High trenching speeds are necessary to reduce construction time and increase the production capacity of open pits. During normal operation, the speed of trenching depends on the intensity of mining, the length of the mining front, the direction of front movement in relation to the occurrence of the ore body, the height and number of mining benches that are in simultaneous mining, the width of working benches and other factors and can be determined by the formula ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 52

Similar articles

Research on parameters of open-cut mining of deposits using caving
1966 V. V. Golitsyn
Toward the theory of systems and improvement of open pit mining technology
1966 N. D. Zolotarev
Determination of length and productivity of a mining block
1966 V. N. Sinkkovsky, N. D. Zolotarev
Selection of parameters and efficiency of the panel mining system ( using the example of the Kingisepp phosphate deposit).
1966 L. G. Tymovsky, I. M. Norkin
Calculation of rods and flexible cable ties at artificial strengthening of rock slopes at quarries.
1966 M. A. Revazov, N. K. Zvonarev
Operational management at open-cut mining worksOperational management at open-cut mining **operations**.
1966 A. D. Shkolnikov