Trenching speeds depending on bench and driving methods

Authors:
S. Ya. Arsenyev
V. M. Prosochkin
Date submitted:
1965-07-04
Date accepted:
1965-09-13
Date published:
1966-07-26

Abstract

High trenching speeds are necessary to reduce construction time and increase the production capacity of open pits. During normal operation, the speed of trenching depends on the intensity of mining, the length of the mining front, the direction of front movement in relation to the occurrence of the ore body, the height and number of mining benches that are in simultaneous mining, the width of working benches and other factors and can be determined by the formula ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 52

Similar articles

Principles of economic substantiation of waste rock removal schedule
1966 A. F. Bogachev
Selection of the mining system for two deposits in one open-pit field
1966 K. A. Kumachev
Calculation of rods and flexible cable ties at artificial strengthening of rock slopes at quarries.
1966 M. A. Revazov, N. K. Zvonarev
Engineering-geological zoning for estimation of stability of rocks in quarry fields (on the example of Tikhvin mining district)
1966 V. N. Novozhilov
Transportation management at coal minesTransport management at open-pit coal mines.
1966 A. D. Shkolnikov
Determination of mining parameters for thin bench development by draglines ( using the example of the Kingisepp phosphate deposit)
1966 I. M. Norkin