Submit an Article
Become a reviewer
Vol 52 Iss. 1
Pages:
12-16
Download volume:
RUS
Article

Selection of the system of development of two deposits of one open pit field

Authors:
K. A. Kumachev
Date submitted:
1965-07-08
Date accepted:
1965-09-13
Date published:
1966-07-26

Abstract

The article considers variants of stripping and development systems with longitudinal preparation of the mining front in conditions of achieving the highest productivity of the open pit Ar. The calculations are based on the length of deposits Lp, their horizontal thickness t, the length Le and the number of blocks on the ledge, the annual productivity of the excavator A b .

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 52

References

  1. Zolotarev N. D. Technology and Economics of Open Pit Mining. Nedra, 1965a.
  2. Zolotarev N.D. Parameters of systems and technological indicators of complexity of open field development. Mining J., No. 10, 19656.

Similar articles

Research of parameters of open-cut mining of deposits with caving
1966 V. V. Golitsyn
Trenching speeds depending on ledge height and sinking methods
1966 S. Ya. Arsenyev, V. M. Prosochkin
Determination of length and productivity of a mining block
1966 V. N. Sinkkovsky, N. D. Zolotarev
Calculation of rods and flexible cable ties at artificial strengthening of rock slopes at quarries.
1966 M. A. Revazov, N. K. Zvonarev
Determination of mining parameters for low-capacity ledge development by draglines (on the example of the Kingisepp phosphate deposit)
1966 I. M. Norkin
Operational management at open-cut mining works
1966 A. D. Shkolnikov