Submit an Article
Become a reviewer
Vol 52 Iss. 1
Pages:
22-27
Download volume:
RUS
Article

Determination of length and productivity of a mining block

Authors:
V. N. Sinkkovsky
N. D. Zolotarev
Date submitted:
1965-07-25
Date accepted:
1965-09-12
Date published:
1966-07-26

Abstract

The labor costs of the main and auxiliary mining processes depend on the number of excavators on the ledge, which determines the length of the blocks and the intensity of the front movement. Under the length of the block is meant the length of the front of work per excavator, which provides independent and productive operation of mining transportation equipment. The length of the block is determined by the conditions of rational technology of adjacent tsroizvodstvennyh processes - loosening, loading and transportation - in accordance with the “Standard projects of development systems and transportation at quarries." When designing the length of the block is taken according to practice, norms or standard projects ...

Область исследования:
(Archived) Without section
Go to volume 52

References

  1. Zolotarev N. D. Technology and Economics of Open Pit Mining. Nedra, 1965.
  2. Rzhevskiy V. V., Shkolnikov A.D., Korobov S. D. Use of electronic computing machines for planning and control of technological processes at quarries. Central Research Institute of Coal, 1965.
  3. Typical Projects of Development and Transportation Systems at Quarries. V. 2, Gosgortekhizdat, 1962.

Similar articles

Transportation management at coal mines
1966 A. D. Shkolnikov
Calculation of rods and flexible cable ties at artificial strengthening of rock slopes at quarries.
1966 M. A. Revazov, N. K. Zvonarev
Preliminary assessment of expediency of application of open pit operations
1966 M. B. Redkin
Research of parameters of open-cut mining of deposits with caving
1966 V. V. Golitsyn
Engineering-geological zoning for estimation of stability of rocks of quarry fields (on the example of Tikhvin mining district)
1966 V. N. Novozhilov
Principles of economic substantiation of waste rock removal schedule
1966 A. F. Bogachev