High-frequency heating method and method of control over cement slurry hardening during well wall anchoring

Authors:
L. B. Nekrasov
A. M. Yakovlev
Date submitted:
1968-08-05
Date accepted:
1968-10-19
Date published:
1969-08-20

Abstract

Creation of cement pipes directly in the wellbore is an actual problem. Cement casing can act as a production string when drilling for water, as well as cover certain complicated zones associated with collapse of well walls or absorption of flushing fluid.

Область исследования:
##submission.archive.categories## Without section
Go to volume 57

References

  1. Netushil A. V. Some problems of the theory of high-frequency heating. Electricity, No. 8, 1952.
  2. Potashnikov V. A., Korablev A. A. Combined acoustic device for determination of dynamic characteristics of concrete and control of its quality. In the collection: Physical and Mechanical Properties, Pressure and Resolution of Rocks, Vol. 2, PH of the AS USSR, 1963.
  3. Rzhevskiy V. V., Novik G. Ya. Fundamentals of rock physics. Nedra, 1966.

Similar articles

Analysis of the temperature regime of drill bit diamonds
1969 L. K. Gorshkov, Yu. M. Pariysky
Estimation of economic efficiency of cooled air blowing during core drilling
1969 A. V. Golovkin, V. I. Kovalenko, V. K. Chistyakov
Effective way to increase core yield and quality in frozen rocks
1969 B. B. Kudryashov, V. I. Kovalenko, V. K. Chistyakov, I. A. Baskilovich, P. M. Stepanov
Experimental study of rock fracture process during rotary-impact drilling
1969 Yu. M. Pariysky
Analysis, calculation and issues of regulation of the temperature regime of the borehole being drilled
1969 B. B. Kudryashov
Physical phenomena at destruction of hard rocks by blunting wedge cutter, complete formula of penetration rate and its application
1969 S. N. Tarakanov