High-frequency heating method and method of control over cement slurry hardening during wellbore fixing.

Authors:
L. B. Nekrasov
A. M. Yakovlev
Date submitted:
1968-08-05
Date accepted:
1968-10-19
Date published:
1969-08-20

Abstract

Creation of cement pipes directly in the wellbore is an urgent problem. Cement casing pipes can act as a production string when drilling for water, as well as isolate certain trouble zones associated with wellbore collapse or loss of drilling fluid.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 57

References

  1. Netushil A. V. Some problems of the theory of high-frequency heating. Electricity Elektrichestvo, No. 8, 1952.
  2. Potashnikov V. A., Korablev A. A. Combined acoustic device for determination of dynamic characteristics of concrete and control of its quality. V sb. Fiz.-mekh. svoystva, davlenie i razreshenie gorn. porod, Vol. 2, Izd-vo AN SSSR, 1963.
  3. Rzhevskiy V. V., Novik G. Ya. Fundamentals of rock physics. Nedra, 1966.

Similar articles

Experience of diamond drilling with compressed air blowout
1969 Yu. M. Pariysky, L. K. Gorshkov, V. F. Fisenko
Calculation of tubular electrode and ohmic resistance at electrochemical well support
1969 V. N. Sennikov
About On well wall consolidation fixing by continuous cement pipe string
1969 F. A. Shamshev, V. N. Sennikov, A. M. Yakovlev
Advantages of air as a circulating agent for drilling wells
1969 N. D. Mikhailova
Physical phenomena at destruction of hard rocks by blunting wedge cutter, complete formula of penetration rate and its application
1969 S. N. Tarakanov
Quick-setting mixtures for wells fixing in permafrost rocks
1969 F. A. Shamshev, A. M. Yakovlev