High-frequency heating method and method of control over cement slurry hardening during well wall anchoring

Authors:
L. B. Nekrasov
A. M. Yakovlev
Date submitted:
1968-08-05
Date accepted:
1968-10-19
Date published:
1969-08-20

Abstract

Creation of cement pipes directly in the wellbore is an actual problem. Cement casing can act as a production string when drilling for water, as well as cover certain complicated zones associated with collapse of well walls or absorption of flushing fluid.

Область исследования:
(Archived) Without section
Go to volume 57

References

  1. Netushil A. V. Some problems of the theory of high-frequency heating. Electricity, No. 8, 1952.
  2. Potashnikov V. A., Korablev A. A. Combined acoustic device for determination of dynamic characteristics of concrete and control of its quality. In the collection: Physical and Mechanical Properties, Pressure and Resolution of Rocks, Vol. 2, PH of the AS USSR, 1963.
  3. Rzhevskiy V. V., Novik G. Ya. Fundamentals of rock physics. Nedra, 1966.

Similar articles

Philip A. Shamshev (75th anniversary of his birth)
1969 Redaktsionnaya Kollegiya
Principles of calculation of drilling parameters with simultaneous freezing of passable rocks
1969 B. B. Kudryashov, V. K. Chistyakov
About well wall consolidation by continuous cement pipe string
1969 F. A. Shamshev, V. N. Sennikov, A. M. Yakovlev
Analysis of the temperature regime of drill bit diamonds
1969 L. K. Gorshkov, Yu. M. Pariysky
Experimental study of rock fracture process during rotary-impact drilling
1969 Yu. M. Pariysky
Calculation of tubular electrode and ohmic resistance at electrochemical well support
1969 V. N. Sennikov