High-frequency heating method and method of control over cement slurry hardening during wellbore fixing.
Abstract
Creation of cement pipes directly in the wellbore is an urgent problem. Cement casing pipes can act as a production string when drilling for water, as well as isolate certain trouble zones associated with wellbore collapse or loss of drilling fluid.
Область исследования:
(Archived) Without section
Funding:
None
References
- Netushil A. V. Some problems of the theory of high-frequency heating. Electricity Elektrichestvo, No. 8, 1952.
- Potashnikov V. A., Korablev A. A. Combined acoustic device for determination of dynamic characteristics of concrete and control of its quality. V sb. Fiz.-mekh. svoystva, davlenie i razreshenie gorn. porod, Vol. 2, Izd-vo AN SSSR, 1963.
- Rzhevskiy V. V., Novik G. Ya. Fundamentals of rock physics. Nedra, 1966.
Similar articles
Experience of diamond drilling with compressed air blowout
1969 Yu. M. Pariysky, L. K. Gorshkov, V. F. Fisenko
Calculation of tubular electrode and ohmic resistance at electrochemical well support
1969 V. N. Sennikov
About On well wall consolidation fixing by continuous cement pipe string
1969 F. A. Shamshev, V. N. Sennikov, A. M. Yakovlev