High-frequency heating method and method of control over cement slurry hardening during wellbore fixing.

Authors:
L. B. Nekrasov
A. M. Yakovlev
Date submitted:
1968-08-05
Date accepted:
1968-10-19
Date published:
1969-08-20

Abstract

Creation of cement pipes directly in the wellbore is an urgent problem. Cement casing pipes can act as a production string when drilling for water, as well as isolate certain trouble zones associated with wellbore collapse or loss of drilling fluid.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 57

References

  1. Netushil A. V. Some problems of the theory of high-frequency heating. Electricity Elektrichestvo, No. 8, 1952.
  2. Potashnikov V. A., Korablev A. A. Combined acoustic device for determination of dynamic characteristics of concrete and control of its quality. V sb. Fiz.-mekh. svoystva, davlenie i razreshenie gorn. porod, Vol. 2, Izd-vo AN SSSR, 1963.
  3. Rzhevskiy V. V., Novik G. Ya. Fundamentals of rock physics. Nedra, 1966.

Similar articles

Normalization of the borehole temperature regime when drilling through permafrost rocks with air bottom-hole cleaning by air
1969 B. B. Kudryashov
New methods of complications control in drilling wells and prospects of their application
1969 F. A. Shamshev, V. N. Sennikov, V. P. Neradov
Estimation of economic efficiency of cooled air blowing during core drilling
1969 A. V. Golovkin, V. I. Kovalenko, V. K. Chistyakov
Physical phenomena at destruction of hard rocks by blunting wedge cutter, complete formula of penetration rate and its application
1969 S. N. Tarakanov
Calculation method of geometrical parameters of screw-drilling tips
1969 I. D. Hesse
Principles of calculation of drilling parameters with simultaneous freezing of passable rocks
1969 B. B. Kudryashov, V. K. Chistyakov