Submit an Article
Become a reviewer
Vol 57 Iss. 2
Pages:
126-131
Download volume:
RUS
Article

High-frequency heating method and method of control over cement slurry hardening during well wall anchoring

Authors:
L. B. Nekrasov
A. M. Yakovlev
Date submitted:
1968-08-05
Date accepted:
1968-10-19
Date published:
1969-08-20

Abstract

Creation of cement pipes directly in the wellbore is an actual problem. Cement casing can act as a production string when drilling for water, as well as cover certain complicated zones associated with collapse of well walls or absorption of flushing fluid.

Область исследования:
(Archived) Without section
Go to volume 57

References

  1. Netushil A. V. Some problems of the theory of high-frequency heating. Electricity, No. 8, 1952.
  2. Potashnikov V. A., Korablev A. A. Combined acoustic device for determination of dynamic characteristics of concrete and control of its quality. In the collection: Physical and Mechanical Properties, Pressure and Resolution of Rocks, Vol. 2, PH of the AS USSR, 1963.
  3. Rzhevskiy V. V., Novik G. Ya. Fundamentals of rock physics. Nedra, 1966.

Similar articles

Analysis, calculation and issues of regulation of the temperature regime of the borehole being drilled
1969 B. B. Kudryashov
New methods of complications control in drilling wells and prospects of their application
1969 F. A. Shamshev, V. N. Sennikov, V. P. Neradov
Experience of diamond drilling with compressed air blowout
1969 Yu. M. Pariysky, L. K. Gorshkov, V. F. Fisenko
Normalization of borehole temperature regime when drilling through permafrost rocks with bottom-hole cleaning by air
1969 B. B. Kudryashov
Quick-setting mixtures for wells fixing in permafrost rocks
1969 F. A. Shamshev, A. M. Yakovlev
Analysis of the temperature regime of drill bit diamonds
1969 L. K. Gorshkov, Yu. M. Pariysky