High-frequency heating method and method of control over cement slurry hardening during well wall anchoring
Abstract
Creation of cement pipes directly in the wellbore is an actual problem. Cement casing can act as a production string when drilling for water, as well as cover certain complicated zones associated with collapse of well walls or absorption of flushing fluid.
Область исследования:
(Archived) Without section
References
- Netushil A. V. Some problems of the theory of high-frequency heating. Electricity, No. 8, 1952.
- Potashnikov V. A., Korablev A. A. Combined acoustic device for determination of dynamic characteristics of concrete and control of its quality. In the collection: Physical and Mechanical Properties, Pressure and Resolution of Rocks, Vol. 2, PH of the AS USSR, 1963.
- Rzhevskiy V. V., Novik G. Ya. Fundamentals of rock physics. Nedra, 1966.
Similar articles
Principles of calculation of drilling parameters with simultaneous freezing of passable rocks
1969 B. B. Kudryashov, V. K. Chistyakov
Physical phenomena at destruction of hard rocks by blunting wedge cutter, complete formula of penetration rate and its application
1969 S. N. Tarakanov