Submit an Article
Become a reviewer
Vol 57 Iss. 2
Pages:
24-26
Download volume:
RUS
Article

About well wall consolidation by continuous cement pipe string

Authors:
F. A. Shamshev
V. N. Sennikov
A. M. Yakovlev
Date submitted:
1968-08-23
Date accepted:
1968-10-20
Date published:
1969-08-20

Abstract

In recent years, when drilling wells for water as a production string is increasingly used pipes are not steel, but from other, cheaper materials. At opening of mineralized waters refusal from application of steel pipes is a necessary condition for normal operation of wells. In this case asbestos-cement, plywood glued and plastic pipes are used for fixing well walls. At present the electrochemical method of well wall fixing is being mastered.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 57

Similar articles

Calculation method of geometrical parameters of screw-drilling tips
1969 I. D. Hesse
Calculation of tubular electrode and ohmic resistance at electrochemical well support
1969 V. N. Sennikov
Analysis of the temperature regime of drill bit diamonds
1969 L. K. Gorshkov, Yu. M. Pariysky
Philip A. Shamshev (75th anniversary of his birth)
1969 Redaktsionnaya Kollegiya
Principles of calculation of drilling parameters with simultaneous freezing of passable rocks
1969 B. B. Kudryashov, V. K. Chistyakov
Physical phenomena at destruction of hard rocks by blunting wedge cutter, complete formula of penetration rate and its application
1969 S. N. Tarakanov