Submit an Article
Become a reviewer
Vol 57 Iss. 2
Pages:
126-131
Download volume:
RUS
Article

High-frequency heating method and method of control over cement slurry hardening during wellbore fixing.

Authors:
L. B. Nekrasov
A. M. Yakovlev
Date submitted:
1968-08-05
Date accepted:
1968-10-19
Date published:
1969-08-20

Abstract

Creation of cement pipes directly in the wellbore is an urgent problem. Cement casing pipes can act as a production string when drilling for water, as well as isolate certain trouble zones associated with wellbore collapse or loss of drilling fluid.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 57

References

  1. Netushil A. V. Some problems of the theory of high-frequency heating. Electricity Elektrichestvo, No. 8, 1952.
  2. Potashnikov V. A., Korablev A. A. Combined acoustic device for determination of dynamic characteristics of concrete and control of its quality. V sb. Fiz.-mekh. svoystva, davlenie i razreshenie gorn. porod, Vol. 2, Izd-vo AN SSSR, 1963.
  3. Rzhevskiy V. V., Novik G. Ya. Fundamentals of rock physics. Nedra, 1966.

Similar articles

Principles of calculation of drilling parameters with simultaneous freezing of passable rocks
1969 B. B. Kudryashov, V. K. Chistyakov
Analysis, calculation and issues of regulation of the temperature regime of the borehole being drilled
1969 B. B. Kudryashov
Calculation method of geometrical parameters of screw-drilling tips
1969 I. D. Hesse
Effective way to increase core yield and quality in frozen rocks
1969 B. B. Kudryashov, V. I. Kovalenko, V. K. Chistyakov, I. A. Baskilovich, P. M. Stepanov
Normalization of the borehole temperature regime when drilling through permafrost rocks with air bottom-hole cleaning by air
1969 B. B. Kudryashov
About On well wall consolidation fixing by continuous cement pipe string