Submit an Article
Become a reviewer
Vol 57 Iss. 2
Pages:
126-131
Download volume:
RUS
Article

High-frequency heating method and method of control over cement slurry hardening during well wall anchoring

Authors:
L. B. Nekrasov
A. M. Yakovlev
Date submitted:
1968-08-05
Date accepted:
1968-10-19
Date published:
1969-08-20

Abstract

Creation of cement pipes directly in the wellbore is an actual problem. Cement casing can act as a production string when drilling for water, as well as cover certain complicated zones associated with collapse of well walls or absorption of flushing fluid.

Область исследования:
(Archived) Without section
Go to volume 57

References

  1. Netushil A. V. Some problems of the theory of high-frequency heating. Electricity, No. 8, 1952.
  2. Potashnikov V. A., Korablev A. A. Combined acoustic device for determination of dynamic characteristics of concrete and control of its quality. In the collection: Physical and Mechanical Properties, Pressure and Resolution of Rocks, Vol. 2, PH of the AS USSR, 1963.
  3. Rzhevskiy V. V., Novik G. Ya. Fundamentals of rock physics. Nedra, 1966.

Similar articles

Calculation of tubular electrode and ohmic resistance at electrochemical well support
1969 V. N. Sennikov
Estimation of economic efficiency of cooled air blowing during core drilling
1969 A. V. Golovkin, V. I. Kovalenko, V. K. Chistyakov
Advantages of air as a circulating agent for drilling wells
1969 N. D. Mikhailova
Philip A. Shamshev (75th anniversary of his birth)
1969 Redaktsionnaya Kollegiya
Experience of diamond drilling with compressed air blowout
1969 Yu. M. Pariysky, L. K. Gorshkov, V. F. Fisenko
Calculation method of geometrical parameters of screw-drilling tips
1969 I. D. Hesse