High-frequency heating method and method of control over cement slurry hardening during wellbore fixing.
Abstract
Creation of cement pipes directly in the wellbore is an urgent problem. Cement casing pipes can act as a production string when drilling for water, as well as isolate certain trouble zones associated with wellbore collapse or loss of drilling fluid.
Область исследования:
(Archived) Without section
Funding:
None
References
- Netushil A. V. Some problems of the theory of high-frequency heating. Electricity Elektrichestvo, No. 8, 1952.
- Potashnikov V. A., Korablev A. A. Combined acoustic device for determination of dynamic characteristics of concrete and control of its quality. V sb. Fiz.-mekh. svoystva, davlenie i razreshenie gorn. porod, Vol. 2, Izd-vo AN SSSR, 1963.
- Rzhevskiy V. V., Novik G. Ya. Fundamentals of rock physics. Nedra, 1966.
Similar articles
Principles of calculation of drilling parameters with simultaneous freezing of passable rocks
1969 B. B. Kudryashov, V. K. Chistyakov
Analysis, calculation and issues of regulation of the temperature regime of the borehole being drilled
1969 B. B. Kudryashov
Effective way to increase core yield and quality in frozen rocks
1969 B. B. Kudryashov, V. I. Kovalenko, V. K. Chistyakov, I. A. Baskilovich, P. M. Stepanov