Submit an Article
Become a reviewer
Vol 57 Iss. 2
Pages:
6-13
Download volume:
RUS
Article

New methods of complications control in drilling wells and prospects of their application

Authors:
F. A. Shamshev
V. N. Sennikov
V. P. Neradov
Date submitted:
1968-08-27
Date accepted:
1968-10-30
Date published:
1969-08-20

Abstract

Until recently, the main way to combat the loss of flushing fluid, well wall collapses in rocky rocks broken by tectonic fractures, was casing. But, as it is known, the use of casing pipes is associated with loss of diameters, so under difficult geological conditions, multi-column well designs are obtained and initial diameters are increased. This leads to additional complications, as the basic rule of drilling is violated: the smaller the diameter of wells, the less wall collapses and the more productive the work is, all other things being equal. Currently, this provision is generally accepted, in connection with which in all countries are moving in the exploration of solid minerals to drilling with drill bits d 46-59 mm in one-stage design of wells, ie, fix the upper unstable rocks pipes, and then drilling is carried out without casing.

Область исследования:
(Archived) Without section
Go to volume 57

Similar articles

Philip A. Shamshev (75th anniversary of his birth)
1969 Redaktsionnaya Kollegiya
Calculation of tubular electrode and ohmic resistance at electrochemical well support
1969 V. N. Sennikov
Physical phenomena at destruction of hard rocks by blunting wedge cutter, complete formula of penetration rate and its application
1969 S. N. Tarakanov
Estimation of economic efficiency of cooled air blowing during core drilling
1969 A. V. Golovkin, V. I. Kovalenko, V. K. Chistyakov
Experience of diamond drilling with compressed air blowout
1969 Yu. M. Pariysky, L. K. Gorshkov, V. F. Fisenko
About well wall consolidation by continuous cement pipe string
1969 F. A. Shamshev, V. N. Sennikov, A. M. Yakovlev