Submit an Article
Become a reviewer
Vol 57 Iss. 2
Pages:
6-13
Download volume:
RUS
Article

New methods of complications control in drilling wells and prospects of their application

Authors:
F. A. Shamshev
V. N. Sennikov
V. P. Neradov
Date submitted:
1968-08-27
Date accepted:
1968-10-30
Date published:
1969-08-20

Abstract

Until recently, the main way to combat the loss of flushing fluid, well wall collapses in rocky rocks broken by tectonic fractures, was casing. But, as it is known, the use of casing pipes is associated with loss of diameters, so under difficult geological conditions, multi-column well designs are obtained and initial diameters are increased. This leads to additional complications, as the basic rule of drilling is violated: the smaller the diameter of wells, the less wall collapses and the more productive the work is, all other things being equal. Currently, this provision is generally accepted, in connection with which in all countries are moving in the exploration of solid minerals to drilling with drill bits d 46-59 mm in one-stage design of wells, ie, fix the upper unstable rocks pipes, and then drilling is carried out without casing.

Область исследования:
(Archived) Without section
Go to volume 57

Similar articles

Normalization of borehole temperature regime when drilling through permafrost rocks with bottom-hole cleaning by air
1969 B. B. Kudryashov
Analysis of the temperature regime of drill bit diamonds
1969 L. K. Gorshkov, Yu. M. Pariysky
Principles of calculation of drilling parameters with simultaneous freezing of passable rocks
1969 B. B. Kudryashov, V. K. Chistyakov
Philip A. Shamshev (75th anniversary of his birth)
1969 Redaktsionnaya Kollegiya
Estimation of economic efficiency of cooled air blowing during core drilling
1969 A. V. Golovkin, V. I. Kovalenko, V. K. Chistyakov
Physical phenomena at destruction of hard rocks by blunting wedge cutter, complete formula of penetration rate and its application
1969 S. N. Tarakanov