Experience of inter-chamber pillar mining after consolidation of the primary chambers' backfill

Authors:
Yu. L. Minaev
A. V. Karpunin
A. G. Vasiliev
Date submitted:
1968-07-28
Date accepted:
1968-09-07
Date published:
1969-05-05

Abstract

In 1966 at the Kaula-Kotselvaara mine of the Pechanganickel Combine, experimental work was carried out on the development of an inter-chamber pillar located between the walls of the cement-reinforced backfill. Pilot works were carried out in a 6-8 m thick section of the ore body with a dip angle of 26-30°. The intervening rocks - phyllites - are partially broken by transverse fractures. In general, the ore and rock are stable. Ore strength coefficient is 8-12, rock strength coefficient is 10-12. Volume weight of the ore is 3.2 t/m3 and of the embedding material is 2.8 t/m3.

Область исследования:
(Archived) Without section
Go to volume 58

Similar articles

Investigation of properties of injection solutions for reinforcing the embedment of cleaning chambers
1969 Yu. L. Minaev
Rational application area of vibratory ore discharge at Apatit Combine
1969 Yu. A. Korotkov
Prof. Vladimir N. Semevsky (1898-1968)
1969 A. I. Shablygin, N. Z. Galaev, Yu. I. Panenkov
On directions of development of technology of underground development of ore deposits
1969 V. N. Semevsky
Economic assessment of damage from losses and dilution during development of rich ores
1969 P. G. Makulov
Possible causes of rock shoots in loose workings on the example of Khibiny apatite deposits
1969 V. I. Krapivin, A. G. Protosenya