Experience of inter-chamber pillar mining after consolidation of the primary chambers' backfill

Authors:
Yu. L. Minaev
A. V. Karpunin
A. G. Vasiliev
Date submitted:
1968-07-28
Date accepted:
1968-09-07
Date published:
1969-05-05

Abstract

In 1966 at the Kaula‑Kotselvaara mine of the Pechenganikel Combine, experimental work was carried out on the development of an inter‑chamber pillar located between the walls of cement‑reinforced backfill. Pilot works were carried out in a 6‑8 m thick section of the ore body with a dip angle of 26‑30°. The host rocks – phyllites – are partially broken by transverse fractures. In general, the ore and rock are stable. The strength coefficient of the ore is 8‑12, of the rock – 10‑12. Bulk density of the ore is 3.2 t/m³, of the backfill material – 2.8 t/m³.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 58

Similar articles

Investigation of the stressed state of pillars under the chamber-pillar system of development at the Mayak mine
1969 V. D. Paliy, Yu. D. Orlov, V. P. Ushenin
On the depth of mining ore deposits by systems with open stopes
1969 A. B. Makeenkov
Possible causes of rock shoots in loose unsupported workings on the example of Khibiny apatite deposits
1969 V. I. Krapivin, A. G. Protosenya
To On the question of underground thermal insulation of horizons insulation at the mines of the Apatit Combine
1969 O. N. Rusak, Yu. N. Nikolaev
Calculation of limit spans of unshored frozen roofs
1969 Yu. V. Shuvalov
Investigation of properties of injection solutions for reinforcing the backfill of stopes.
1969 Yu. L. Minaev