Article

Experience of inter-chamber pillar mining after consolidation of the primary chambers' backfill

Authors:
Yu. L. Minaev
A. V. Karpunin
A. G. Vasiliev
Date submitted:
1968-07-28
Date accepted:
1968-09-07
Date published:
1969-05-05

Abstract

In 1966 at the Kaula-Kotselvaara mine of the Pechanganickel Combine, experimental work was carried out on the development of an inter-chamber pillar located between the walls of the cement-reinforced backfill. Pilot works were carried out in a 6-8 m thick section of the ore body with a dip angle of 26-30°. The intervening rocks - phyllites - are partially broken by transverse fractures. In general, the ore and rock are stable. Ore strength coefficient is 8-12, rock strength coefficient is 10-12. Volume weight of the ore is 3.2 t/m3 and of the embedding material is 2.8 t/m3.

Область исследования:
(Archived) Without section
Go to volume 58

Similar articles

Investigation of bearing pressure at different order of block excavation in a floor (for conditions of mining of lower horizons of Kirovsky mine of Apatit Combine)
1969 N. Z. Galaev, G. G. Milekhin
Peculiarities of underground development of powerful deposits of multigrade ores
1969 A. I. Shablygin, V. G. Eliseev
Economic assessment of damage from losses and dilution during development of rich ores
1969 P. G. Makulov
Investigation of the stressed state of pillars under the chamber-pillar system of development at the Mayak mine
1969 V. D. Paliy, Yu. D. Orlov, V. P. Ushenin
Depth of ore deposits development by open-cutting systems
1969 A. B. Makeenkov
Influence of ore massif fracturing on ore stripping by deep boreholes at the mines of Pechenganickel Combine
1969 E. G. Lezgintsev