Experience of inter-chamber pillar mining after consolidation of the primary chambers' backfill

Authors:
Yu. L. Minaev
A. V. Karpunin
A. G. Vasiliev
Date submitted:
1968-07-28
Date accepted:
1968-09-07
Date published:
1969-05-05

Abstract

In 1966 at the Kaula‑Kotselvaara mine of the Pechenganikel Combine, experimental work was carried out on the development of an inter‑chamber pillar located between the walls of cement‑reinforced backfill. Pilot works were carried out in a 6‑8 m thick section of the ore body with a dip angle of 26‑30°. The host rocks – phyllites – are partially broken by transverse fractures. In general, the ore and rock are stable. The strength coefficient of the ore is 8‑12, of the rock – 10‑12. Bulk density of the ore is 3.2 t/m³, of the backfill material – 2.8 t/m³.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 58

Similar articles

Influence of concrete supports on bearing capacity of ore pillars under chamber mining systems
1969 V. P. Ushenin
Economic assessment of damage from losses and dilution during development of rich ores
1969 P. G. Makulov
Influence of heap pillar wall reinforcement on heap pillar strength
1969 Yu. A. Modestov
On directions of development of technology of underground development of ore deposits
1969 V. N. Semevsky
Investigation of the influence of ore size on its flowing out
1969 L. F. Belichenko
Possible causes of rock shoots in loose unsupported workings on the example of Khibiny apatite deposits
1969 V. I. Krapivin, A. G. Protosenya