Experience of inter-chamber pillar mining after consolidation of the primary chambers' backfill

Authors:
Yu. L. Minaev
A. V. Karpunin
A. G. Vasiliev
Date submitted:
1968-07-28
Date accepted:
1968-09-07
Date published:
1969-05-05

Abstract

In 1966 at the Kaula‑Kotselvaara mine of the Pechenganikel Combine, experimental work was carried out on the development of an inter‑chamber pillar located between the walls of cement‑reinforced backfill. Pilot works were carried out in a 6‑8 m thick section of the ore body with a dip angle of 26‑30°. The host rocks – phyllites – are partially broken by transverse fractures. In general, the ore and rock are stable. The strength coefficient of the ore is 8‑12, of the rock – 10‑12. Bulk density of the ore is 3.2 t/m³, of the backfill material – 2.8 t/m³.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 58

Similar articles

Mining excavations by pre-slotting method
1969 V. V. Sychev
On the depth of mining ore deposits by systems with open stopes
1969 A. B. Makeenkov
Excavation of barrier pillars during mining of ore fields by caving systems
1969 N. Z. Galaev
Investigation of the stressed state of pillars under the chamber-pillar system of development at the Mayak mine
1969 V. D. Paliy, Yu. D. Orlov, V. P. Ushenin
Computer-aided selection of optimal parameters of blocks in caving development
1969 A. A. Kavtaskin
Investigation of the influence of complex hypsometry of the ore body on the value of ore loss and dilution
1969 A. I. Shablygin, V. G. Eliseev