Submit an Article
Become a reviewer
Vol 54 Iss. 1
Pages:
130-133
Download volume:
RUS
Article

Testing of the PK-7 combine at the mine No. 3 of the Leningradslanets Trust.

Authors:
M. D. Kolomiitsov
Date submitted:
1966-07-18
Date accepted:
1966-09-26
Date published:
1967-09-21

Abstract

The tests were carried out in 1965 to determine the efficiency of destruction of layers of industrial oil shale stack by the executive body of the combine, which is a milling-type rebound crown. The rotation speed of the crown is 58 r/min from the electric motor KOF-22-4k (25 kW). Rotation of the crown in the vertical, horizontal planes and feed back and forth (0,5 m) are carried out by hydraulic cylinders. Two hydraulic jacks provide the harvester's support between the roof and the soil. The hydraulic jack pumps are driven by the second electric motor KOF-22-4k. Thus, the total installed power of the motors for rotation and feeding of the crown is 50 kW ...

Область исследования:
(Archived) Information on scientific works of the Leningrad Mining Institute
Go to volume 54

Similar articles

Resistance of oil shale layers to mechanical fracture
1967 I. F. Bobrov, M. D. Kolomiitsov, Ya. P. Lukoshkov, V. E. Rosenkevich
Application of the rope traction organ in conveyors
1967 A. M. Factorovich, O. D. Serebrennikov
Transformation of compressed air pressure for mining machines
1967 A. S. Smorodin
Ore transportation through deep ore chambers
1967 V. I. Gerontiev, A. M. Factorovich, L. G. Tymovsky, O. D. Serebrennikov
Selection of three-phase current electric drive for pneumatic wheeled self-propelled cars
1967 I. I. Margolin
Fundamentals of the theory of the static-acting swarm operation and determination of its productivity
1967 G. A. Nedoluzhenko