Submit an Article
Become a reviewer
Vol 59 Iss. 1
Pages:
47-53
Download volume:
RUS
Article

Method of taking into account the correction for the variability of the sound velocity at sounding survey of technical wells

Authors:
V. K. Chumak
Date submitted:
1968-07-23
Date accepted:
1968-09-06
Date published:
1969-09-12

Abstract

In the process of drilling and fixing technical wells of large diameter (1.0-3.6 m) there are a number of technical problems, the solution of which is possible if the geometry and dimensions of the borehole (curvature of the axis, the size of the wall development, etc.), as well as the position of the support during its construction are known. Wells are drilled vertically up to 1000 m deep. Drilling is carried out with the use of flushing fluid, as which is used clay solution with a specific gravity of up to 1.25 g/cm2 depending on the strength of the rock...

Область исследования:
(Archived) Without section
Go to volume 59

References

  1. Aranovich V. B. et al. Technical errors of sounding measurements in surveying works. Journal of Mining Institute, vol. XLVI, iss. 2, 1963.
  2. Bergman L. Ultrasound. IL, 1957.
  3. Leibenzon B. I. Control of verticality of mine shafts by ultrasonic locating method. Mine Construction, No. 4, 1965.
  4. Tyurin A. M., Stashkevich A. P. P., Taranov E. S. Fundamentals of Hydroacoustics. Sudostroenie, 1966.

Similar articles

About one of the ways of switching from reception to transmission of electroacoustic transducers of sound locators
1969 A. E. Taranov
Determination of unknowns by the graph of the system of normal equations
1969 S. A. Korobkov
Peculiarities of stereophotogrammetry use for determining the deformation of building structures
1969 G. Z. Skoblov
Equalization of surveying underground reference networks
1969 A. N. Belolikov
Estimation of accuracy of points determination in the systems of polygonometric and theodolite passes
1969 A. N. Belolikov
Calculation of input circuits of pulse ultrasonic devices
1969 V. B. Aranovich