Submit an Article
Become a reviewer
Vol 59 Iss. 1
Pages:
112-116
Download volume:
RUS
Article

Equalization of surveying underground reference networks

Authors:
A. N. Belolikov
Date submitted:
1968-07-17
Date accepted:
1968-09-01
Date published:
1969-09-12

Abstract

Theodolite moves laid along underground workings are calculated gradually, as the workings advance. For some time the courses remain dangling, then they gradually form closed polygons, to a greater or lesser extent interconnected. Connection of the underground reference network to the redundant source data (directional angles of the sides, determined by the gyroscopic method, coordinates of points transferred from the surface through vertical or inclined excavations) is carried out relatively rarely.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 59

Similar articles

Surveying works at construction of dredges
1969 G. A. Krotov, M. I. Krylov, M. M. Shlykov, I. S. Vopilov
About the accuracy of photo schemes compilation at geological photo-documentation of underground mine workings
1969 E. V. Ponomarev
About shock excitation of a piezoelectric radiator
1969 A. E. Taranov
Strict equalization of the route network of analytical spatial phototriangulation
1969 V. V. Zverevich
About one of the ways of switching from reception to transmission of electroacoustic transducers of sound locators
1969 A. E. Taranov
Influence of the ampoule wall shape on the image quality of optical systems with a single-liquid compensator
1969 Yu. I. Bespalov