Submit an Article
Become a reviewer
Vol 59 Iss. 1
Pages:
97-104
Download volume:
RUS
Article

About On the methodology and accuracy of surveying service of drilling and blasting works

Authors:
S. P. Pavlov
Date submitted:
1968-07-07
Date accepted:
1968-09-10
Date published:
1969-09-12

Abstract

When servicing drilling and blasting operations in an open pit, a surveyor needs to determine the actual location of the blasted bench and the actual parameters of drilling and blasting operations , as well as the characteristics of structural features (fracturing) of the rock mass.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 59

References

  1. Zhakanov Sh. J., Shrubko S. A. Methodology of taking into account the structural elements of rocks in the exploration and development of mineral deposits. In the book: Problems of rock mechanics. 1966.
  2. Reiphard J. S. Action of Stress Waves in Rocks. V kn.: Razrushenie i mekhanika gornykh porod. Gosgortekhizdat, 1962.
  3. Surveyor's Handbook, pt. II. Metallurgizdat, 1955.
  4. Technical Instruction on the Production of Surveying Works. Ugletekhizdat, 1959.
  5. Supplement to the Technical Instruction on the production of surveying works. Ugletekhizdat, 1960.

Similar articles

On the accuracy of photo scheme compilation in geological photo-documentation of underground mine workings workings
1969 E. V. Ponomarev
Estimation of accuracy of points determination in polygonometric and theodolite traverses
1969 A. N. Belolikov
On the calculation of input circuits of pulse ultrasonic devices
1969 V. B. Aranovich
About estimation On the evaluation of approximate methods of measurement equalization
1969 V. G. Zdanovich
Differential formulas for expressing errors of analytical spatial phototriangulation network elements of a single route
1969 V. V. Zverevich
Founder of the Russian surveying school V. I. Bauman (on the 100th anniversary of his birth)
1969 D. A. Kazakovsky, I. I. Ushakov