Submit an Article
Become a reviewer
Vol 63 Iss. 1
Pages:
44-45
Download volume:
RUS
Article

Clarification of the boundary stripping ratio in the development of complex ores

Authors:
L. F. Sannikova
Date submitted:
1971-07-06
Date accepted:
1971-09-20
Date published:
1972-07-07

Abstract

One of the well-known methods of determining the limit overburden ratio in open pit mining is the method of comparing the allowable cost of the mineral, calculated taking into account all capital costs of mining and processing of raw materials and recoverable value, with the actual cost of ore extraction and removed overburden, taken by analogues...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

Similar articles

Development of low-power shale beds by mounted rippers
1972 N. N. Timofeev
Blasted rock mass stockpile management at a quarry
1972 K. I. Kataya, N. P. Ershov, A. F. Bogachev, V. V. Plekhov
Statistical analysis of working area width
1972 A. F. Bogachev, D. I. Shitov
On efficiency of averaging stacks operation
1972 E. I. Azbel, A. I. Shein
Planning of excavator productivity in the Polar region conditions
1972 B. A. Egin
Technology of development of watered rock formations by draglines
1972 G. S. Mikhailov, Kh. S. Davlet-Kildiev, L. A. Slutsman