Prevention of emergency modes at start-up of hydraulic transportation plants
Authors:
Abstract
There are known cases when start-up processes of hydraulic conveying plants were accompanied by accidents. The cause of such accidents is a hydraulic shock arising due to the formation of “plugs” and rupture of flow continuity at the moment of switching on the subsequent stages in schemes with several pumping stations operating in series. “Plugging” in the pipelines occurs, as a rule, at previous stops.
Область исследования:
(Archived) Without section
References
- Dzhvarsheishvili A. G., Kirmelashvili G. I. Unsteady modes of systems supplying two-phase liquid. Tbilisi, Metsniereba, 1965.
- Pokrovskaya V. N., Povolotsky D. G. Prevention of hydraulic shocks in pumping installations for pumping tailings. Mining Journal, 1967, No. 4.
- Povolotsky D.G. Prevention of emergency modes at consistency regulation in hydraulic transportation installations. University Proc., Journal of Mining Institute, 1969, No. 9.
Similar articles
Methodology of determination of the mechanical characteristic of the mining machine feed drive on the test bench
1973 M. D. Kolomiitsov, V. V. Gabov, A. F. Lorenzo
Principles of construction of automated control systems of railway transportation for schemes with one assembly station
1973 L. G. Tymovsky, I. I. Margolin