Method of calculation of spoil heaps settlements under heavy excavators
Authors:
Abstract
In construction practice, the most common method of calculating foundation settlement recommended by SNiP is the layer-by-layer summation method, taking into account only the maximum axial compressive stresses under the condition that lateral expansion of the soil is impossible. The essence of it is that under the center of the loaded site mentally allocate in the ground vertical prism with a cross-section of one and height from the level of the footing to the depth of the active zone of compression to the bedrock. ...
Область исследования:
(Archived) Without section
Similar articles
Engineering-geological aspects of slope management in open pit mining of mineral deposits
1976 M. A. Revazov
Experience of drawing up predictive engineering-geological maps in selecting the most promising lithological horizons for designing field mine workings in them
1976 A. A. Sidorov, V. M. Komlev, A. I. Leleko
Protection of surface and ground waters in the permafrost zone in connection with open-pit mining of placer deposits
1976 V. N. Novozhilov, M. S. Kotova, G. A. Dvoskin, V. N. Shemyakin
Peculiarities of engineering-geological conditions of Karaganda coal basin territory
1976 V. G. Samsonenko