Method of calculation of spoil heaps settlements under heavy excavators

Article preview

In construction practice, the most common method of calculating foundation settlement recommended by SNiP is the layer-by-layer summation method, taking into account only the maximum axial compressive stresses under the condition that lateral expansion of the soil is impossible. The essence of it is that under the center of the loaded site mentally allocate in the ground vertical prism with a cross-section of one and height from the level of the footing to the depth of the active zone of compression to the bedrock. ...

How to cite: Zagoruyko L.P. Method of calculation of spoil heaps settlements under heavy excavators // Journal of Mining Institute. 1976. Vol. 70 № 2. p. 72-76.