L. P. Zagoruyko
L. P. Zagoruyko

Articles

Article
  • Date submitted
    1975-08-08
  • Date accepted
    1975-10-30

Method of calculation of spoil heaps settlement under heavy excavators

Article preview

In construction practice, the most common method of calculating foundation settlement recommended by SNiP is the layer-by-layer summation method, taking into account only the maximum axial compressive stresses under the condition that lateral expansion of the soil is impossible. The essence of it is that under the center of the loaded site **a vertical prism is mentally allocated** in the ground **with a cross-section of unity** and **a** height from the level of the footing to the depth of the active zone of compression to the bedrock. ...

How to cite: Zagoruyko L.P. Method of calculation of spoil heaps settlement under heavy excavators // Journal of Mining Institute. 1976. Vol. 70. Iss. 2. p. 72-76.