Method of calculation of spoil heaps settlements under heavy excavators
Authors:
Abstract
In construction practice, the most common method of calculating foundation settlement recommended by SNiP is the layer-by-layer summation method, taking into account only the maximum axial compressive stresses under the condition that lateral expansion of the soil is impossible. The essence of it is that under the center of the loaded site mentally allocate in the ground vertical prism with a cross-section of one and height from the level of the footing to the depth of the active zone of compression to the bedrock. ...
Область исследования:
(Archived) Without section
Similar articles
Dynamic and kinematic types of deformations of slope zones of dumps at KMA quarries
1976 G. V. Korotaev, V. S. Zharikov, A. V. Artemyev
Conditions of stability and reclamation of hydraulic dumps taking into account consolidation of reclaimed rocks
1976 O. Yu. Kryachko, Yu. A. Norvatov, G. I. Godlevskaya
Use of search and information system of engineering-geological conditions of solid mineral deposits for estimation of stability of quarry sides
1976 T. N. Ganicheva