Submit an Article
Become a reviewer
Vol 70 Iss. 2
Pages:
72-76
Download volume:
RUS
Article

Method of calculation of spoil heaps settlements under heavy excavators

Authors:
L. P. Zagoruyko
Date submitted:
1975-08-08
Date accepted:
1975-10-30
Date published:
1976-02-01

Abstract

In construction practice, the most common method of calculating foundation settlement recommended by SNiP is the layer-by-layer summation method, taking into account only the maximum axial compressive stresses under the condition that lateral expansion of the soil is impossible. The essence of it is that under the center of the loaded site mentally allocate in the ground vertical prism with a cross-section of one and height from the level of the footing to the depth of the active zone of compression to the bedrock. ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 70

Similar articles

Peculiarities of geogolic structure of coal deposits with thick deposits, determining engineering-geological conditions of their development
1976 V. V. Kiryukov
Rational use of subsurface resources and environmental protection in open-pit mining of mineral deposits
1976 V. N. Novozhilov
Conditions of stability and reclamation of hydraulic dumps taking into account consolidation of reclaimed rocks
1976 O. Yu. Kryachko, Yu. A. Norvatov, G. I. Godlevskaya
Engineering-geological aspects of slope management in open pit mining of mineral deposits
1976 M. A. Revazov
Study of geologic structure, mechanical properties and state of rocks of mineral deposits for forecasting stability of mined-out spaces and protection of the day surface
1976 E. V. Kasparyan, R. V. Medvedev, V. V. Zhukov, E. V. Chernov
Methods of revealing and taking into account the factors influencing the engineering-geological evaluation of deposits
1976 B. V. Smirnov