Method of calculation of spoil heaps settlements under heavy excavators
Authors:
Abstract
In construction practice, the most common method of calculating foundation settlement recommended by SNiP is the layer-by-layer summation method, taking into account only the maximum axial compressive stresses under the condition that lateral expansion of the soil is impossible. The essence of it is that under the center of the loaded site mentally allocate in the ground vertical prism with a cross-section of one and height from the level of the footing to the depth of the active zone of compression to the bedrock. ...
Область исследования:
(Archived) Without section
Similar articles
Engineering-geological conditions of formation of dumps made of coarse clastic rocks
1976 V. P. Novikov, O. B. Medovshchikov
Use of search and information system of engineering-geological conditions of solid mineral deposits for estimation of stability of quarry sides
1976 T. N. Ganicheva
Engineering-geological aspects of slope management in open pit mining of mineral deposits
1976 M. A. Revazov
Engineering-geological properties of rock layers and their influence on rational excavation of coal seams of complex structure (on the example of Donbass)
1976 V. V. Fromm