Method of calculation of spoil heaps settlements under heavy excavators

Authors:
L. P. Zagoruyko
Date submitted:
1975-08-08
Date accepted:
1975-10-30
Date published:
1976-02-01

Abstract

In construction practice, the most common method of calculating foundation settlement recommended by SNiP is the layer-by-layer summation method, taking into account only the maximum axial compressive stresses under the condition that lateral expansion of the soil is impossible. The essence of it is that under the center of the loaded site mentally allocate in the ground vertical prism with a cross-section of one and height from the level of the footing to the depth of the active zone of compression to the bedrock. ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 70

Similar articles

Engineering-geological aspects of slope management in open pit mining of mineral deposits
1976 M. A. Revazov
Rational use of subsurface resources and environmental protection in open-pit mining of mineral deposits
1976 V. N. Novozhilov
Engineering-geological properties of rock layers and their influence on rational excavation of coal seams of complex structure (on the example of Donbass)
1976 V. V. Fromm
Engineering and geological assessment of possibilities to reduce the area of open pits and dumps during the development of KMA and Kuzbass deposits
1976 A. M. Galperin
Use of search and information system of engineering-geological conditions of solid mineral deposits for estimation of stability of quarry sides
1976 T. N. Ganicheva
Some engineering-geological and hydraulic engineering peculiarities of design and construction of multilevel dumps at KMA quarries
1976 G. V. Korotaev, V. S. Zharikov, A. V. Artemyev, Yu. V. Sokolova