Method of calculation of spoil heaps settlements under heavy excavators
Authors:
Abstract
In construction practice, the most common method of calculating foundation settlement recommended by SNiP is the layer-by-layer summation method, taking into account only the maximum axial compressive stresses under the condition that lateral expansion of the soil is impossible. The essence of it is that under the center of the loaded site mentally allocate in the ground vertical prism with a cross-section of one and height from the level of the footing to the depth of the active zone of compression to the bedrock. ...
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Rational use of subsurface resources and environmental protection in open-pit mining of mineral deposits
1976 V. N. Novozhilov
Experience of drawing up predictive engineering-geological maps in selecting the most promising lithological horizons for designing field mine workings in them
1976 A. A. Sidorov, V. M. Komlev, A. I. Leleko
Methods of revealing and taking into account the factors influencing the engineering-geological evaluation of deposits
1976 B. V. Smirnov