Method of calculation of spoil heaps settlements under heavy excavators
Authors:
Abstract
In construction practice, the most common method of calculating foundation settlement recommended by SNiP is the layer-by-layer summation method, taking into account only the maximum axial compressive stresses under the condition that lateral expansion of the soil is impossible. The essence of it is that under the center of the loaded site mentally allocate in the ground vertical prism with a cross-section of one and height from the level of the footing to the depth of the active zone of compression to the bedrock. ...
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Assessment of engineering-geological phenomena and processes in the mining zone at coal and ore deposits in connection with the tasks of environmental protection
1976 G. G. Skvortsov, V. V. Fromm, B. M. Gamalay
Study of geologic structure, mechanical properties and state of rocks of mineral deposits for forecasting stability of mined-out spaces and protection of the day surface
1976 E. V. Kasparyan, R. V. Medvedev, V. V. Zhukov, E. V. Chernov
Some engineering-geological and hydraulic engineering peculiarities of design and construction of multilevel dumps at KMA quarries
1976 G. V. Korotaev, V. S. Zharikov, A. V. Artemyev, Yu. V. Sokolova
Experience of drawing up predictive engineering-geological maps in selecting the most promising lithological horizons for designing field mine workings in them
1976 A. A. Sidorov, V. M. Komlev, A. I. Leleko