Method of calculation of spoil heaps settlement under heavy excavators

Authors:
L. P. Zagoruyko
Date submitted:
1975-08-08
Date accepted:
1975-10-30
Date published:
1976-02-01

Abstract

In construction practice, the most common method of calculating foundation settlement recommended by SNiP is the layer-by-layer summation method, taking into account only the maximum axial compressive stresses under the condition that lateral expansion of the soil is impossible. The essence of it is that under the center of the loaded site **a vertical prism is mentally allocated** in the ground **with a cross-section of unity** and **a** height from the level of the footing to the depth of the active zone of compression to the bedrock. ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 70

References

  1. Tsytovich N. A. Soil Mechanics. M., Vysshaya Shkola, 1973 (in Russian)

Similar articles

Peculiarities of engineering-geological conditions of the Karaganda coal basin territory
1976 V. G. Samsonenko
Engineering-geological assessment of possibilities of reducing the areas of open pits and dumps during the development of KMA and Kuzbass deposits
1976 A. M. Galperin
Engineering-geological aspects of slope control in open-pit mining of mineral deposits
1976 M. A. Revazov
Provision of stability of a hydraulic fill for overburden storage at Lebedinsky and Yuzhno-Lebedinsky open-pit mines of KMA
1976 Yu. A. Sobolevsky, N. N. Baranov, V. A. Meshkov, V. M. Pavlenko
Engineering-geological features of the structure of hard rocks of deposits of the Turgai iron ore belt
1976 V. G. Zoteev, V. N. Morozov, V. V. Komarov
Protection of surface and underground waters in the permafrost zone in connection with open-pit mining of placer deposits
1976 V. N. Novozhilov, M. S. Kotova, G. A. Dvoskin, V. N. Shemyakin