Submit an Article
Become a reviewer
Vol 70 Iss. 2
Pages:
62-65
Download volume:
RUS
Article

Provision of stability of a hydraulic dump for overburden storage at Lebedinsky and Yuzhno-Lebedinsky open-pit mines of KMA

Authors:
Yu. A. Sobolevsky
N. N. Baranov
V. A. Meshkov
V. M. Pavlenko
Date submitted:
1975-08-04
Date accepted:
1975-10-20
Date published:
1976-02-01

Abstract

Lebedinsky and Yuzhno-Lebedinsky open pits of KMAruda combine are part of Lebedinsky mine. When developing these quarries, along with dry mining mechanisms, hydromechanization means are also used (in Yuzhno-Lebedinsky up to 100%, and in Lebedinsky about 10% of the total overburden). ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 70

Similar articles

Use of search and information system of engineering-geological conditions of solid mineral deposits for estimation of stability of quarry sides
1976 T. N. Ganicheva
Peculiarities of geogolic structure of coal deposits with thick deposits, determining engineering-geological conditions of their development
1976 V. V. Kiryukov
Mechanism of landslides in quarries
1976 A. M. Demin
Pollution and protection of geological environment in Slantsy mining district
1976 A. I. Korotkov
Peculiarities of engineering-geological conditions of Karaganda coal basin territory
1976 V. G. Samsonenko
Estimation of stability of rock slopes of deep and super-deep quarries
1976 V. G. Zoteev, V. V. Komarov, A. F. Nozhin