Submit an Article
Become a reviewer
Vol 77
Pages:
144-145
Download volume:
RUS
Article

Radio control of DET-250 bulldozer

Authors:
E. K. Kersky
Date submitted:
1977-10-18
Date accepted:
1977-12-14
Date published:
1978-04-01

Abstract

At the Mukulansky open pit of Tyrnyauz Mining and Metallurgical Combine bulldozers are often forced to work in dangerous areas above the excavated space and on unstable areas of rock from the shafts during their leveling. Very dangerous is the presence of people and machines on the so-called collapse prism - a part of the shaft surface, which even with a slight additional load can lose its grip on the main mass of rock of the moldboard and under the action of its own weight collapse downwards together with the bulldozer and people ...

Область исследования:
(Archived) Without section
Go to volume 77

Similar articles

Method of measuring cargo weight in dump truck by built-in weighing device
1978 M. A. Semenov
Frequency mixers for high-frequency capacitance meters made on the scheme of F-meter
1978 E. A. Kalm
Modeling of the automatic control system of the closed cycle of grinding on the analog computing machine
1978 V. I. Zlatkin, P. P. Ryzhii, A. Kh. Gorelik, E. E. Steinman, A. N. Makovsky
Capacitive-thermal moisture meter of bulk enrichment products
1978 E. S. Krichevsky, V. P. Terekhov
Boundaries of applicability of the search-free method of optimization of beneficiation processes
1978 V. I. Zlatkin
Influence of the schemes of the executive body drive of the mechanohydraulic harvester on its theoretical productivity
1978 B. S. Makhovikov