Radio control of DET-250 bulldozer

Authors:
E. K. Kersky
Date submitted:
1977-10-18
Date accepted:
1977-12-14
Date published:
1978-04-01

Abstract

At the Mukulansky open pit of Tyrnyauz Mining and Metallurgical Combine bulldozers are often forced to work in dangerous areas above the excavated space and on unstable areas of rock from the shafts during their leveling. Very dangerous is the presence of people and machines on the so-called collapse prism - a part of the shaft surface, which even with a slight additional load can lose its grip on the main mass of rock of the moldboard and under the action of its own weight collapse downwards together with the bulldozer and people ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 77

Similar articles

Features of measuring circuits with parametric modulation
1978 V. G. Valeev, A. F. Avdeeva
Frequency mixers for high-frequency capacitance meters made on the scheme of F-meter
1978 E. A. Kalm
Influence of the schemes of the executive body drive of the mechanohydraulic harvester on its theoretical productivity
1978 B. S. Makhovikov
Method of measuring the resistance of the filtering layer of a vacuum filter when studying it as an object of automatic control
1978 A. G. Tsai
Sensitivity of the capacitive primary density transducer
1978 E. V. Zhilkina
Pneumohydraulic suspension of heavy-duty dump trucks as a source of measuring information for built-in weighing devices
1978 V. A. Gardzish, M. A. Semenov