Submit an Article
Become a reviewer
Vol 82
Pages:
60-66
Download volume:
RUS
Article

Calculation of near-shot pillars

Authors:
S. A. Tolstunov
Date submitted:
1979-08-06
Date accepted:
1979-10-03
Date published:
1980-02-01

Abstract

Mine and laboratory studies by the method of volumetric models established that the operation of the main roof is to some extent similar to the operation of thin slabs. In the general case, the main roof in the mode of its steady motion is a cantilever plate on an elastic base, which rests on the coal massif in front of the mine face and near-shot pillars ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 82

References

  1. Borisov A.A. Calculations of Mountain Pressure in Face faces of hollow strata. M., Nedra, 1964.
  2. Kiselev V.A. Beams and Frames on an Elastic Base. L., ONTI, 1936.
  3. Slesarev V.D. Determination of optimal sizes of healds of different purpose. M.-L., Ugletekhizdat, 1948.

Similar articles

Influence of unloading of the edge zone of the formation on the condition of the roof in the bottom-hole space of the faces
1980 V. P. Zubov
Specifics of selecting optimal parameters of probe devices for studying the stressed state of the array
1980 V. I. Kimkov
Determination of the time of steady state of a pit ledge on the basis of a thermodynamic model
1980 V. A. Padukov, S. V. Kiryukov
Investigation of force interaction of layers during deformation of layered embedding massifs
1980 E. D. Kochetkov, A. N. Filippov
Determining equations of the deformation theory of rock plasticity
1980 A. G. Protosenya, A. K. Chernikov
Calculation of the minimum width of pillars during combine mining of potash seams
1980 N. M. Proskuryakov, A. K. Chernikov