Determination of the time of steady state of a pit ledge on the basis of a thermodynamic model
Abstract
In the practice of open-pit mining, there are often situations in which the stable condition of a section of the ledge or pit wall must be maintained only for a certain, often very small period of time ...
Область исследования:
(Archived) Without section
Funding:
None
References
- Vyalov S.S. Rheological bases of soil mechanics, M., Vyshaya Shkola, 1978.
- Instruction on observation of deformations of ledges, sides and dumps of quarries. L., VNIMI, 1971.
- Rogel B.P., Slutsker A.P., Tomashevsky E.E. Kinetic Nature of Strength of Solids. M., Nauka, 1974.
- Fadeev A.B. Strength and Informability of Rocks. M., Nedra, 1979.
Similar articles
Calculation of the minimum width of pillars during combine mining of potash seams
1980 N. M. Proskuryakov, A. K. Chernikov
Calculation of inter-chamber pillar cuts using the method of beams-slabs on an elastic base.
1980 S. N. Suglobov
Investigation of force interaction of layers during deformation of layered embedding massifs
1980 E. D. Kochetkov, A. N. Filippov