Submit an Article
Become a reviewer
Vol 84
Pages:
57-59
Download volume:
RUS
Article

Laboratory installation for reactive power regulation

Authors:
N. V. Nefedova
Date submitted:
1978-08-07
Date accepted:
1978-10-04
Date published:
1979-02-01

Abstract

It is possible to reduce voltage and active power losses in the mine distribution network by simultaneous inclusion of longitudinal capacitive compensation units for voltage losses and unregulated reactive power sources ...

Область исследования:
(Archived) Without section
Go to volume 84

Similar articles

Experience of industrial operation of CPC in 6 kV distribution networks of potash mines
1979 O. V. Ivanov, B. P. Konovalov, M. M. Malyushitsky, V. D. Ryzhkov
Peculiarities of longitudinal and transverse compensation of voltage and reactive power losses in mine distribution networks
1979 V. M. Kvyatkovsky, E. M. Proskuryakov, L. N. Smirnova, Ya. E. Shklyarsky
Control units of thyristor frequency converter in vector control system
1979 V. V. Alekseev, V. A. Dartau, Yu. P. Pavlov, V. V. Rudakov
Analysis of mine distribution networks with longitudinal-transverse compensation
1979 V. M. Kvyatkovsky, N. V. Nefedova, Ya. E. Shklyarsky
Application of analytical self-tuning circuits in electric drives with sequential correction
1979 A. S. Soloviev, N. A. Ambartsumyan
Influence of inductance of thyristor arrester power circuit on short-circuit CPC modes
1979 S. A. Maksimov