Submit an Article
Become a reviewer
Vol 84
Pages:
57-59
Download volume:
RUS
Article

Laboratory installation for reactive power regulation

Authors:
N. V. Nefedova
Date submitted:
1978-08-07
Date accepted:
1978-10-04
Date published:
1979-02-01

Abstract

It is possible to reduce voltage and active power losses in the mine distribution network by simultaneous inclusion of longitudinal capacitive compensation units for voltage losses and unregulated reactive power sources ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 84

Similar articles

Calculation methodology of distribution networks of mining enterprises with compensating devices for voltage and reactive power losses
1979 O. V. Ivanov, E. M. Proskuryakov, L. N. Smirnova
Formation on a physical model of loads statistically equivalent to real ones
1979 B. P. Konovalov
Perspectivity of CPT3-I equipment for mine electric locomotives
1979 E. V. Bannikov, V. P. Stepanenko
Methodology of calculation of modes of CPC with thyristor arrester at short circuits in distribution networks 6 kV
1979 O. V. Ivanov, S. A. Maksimov, E. M. Proskuryakov
Criteria of mine electric locomotive control during train moving from a place
1979 V. N. Kordakov
Ways to increase train traffic safety at automation of electric locomotive pulling
1979 O. B. Lakota, V. N. Kordakov