Calculation methodology of distribution networks of mining enterprises with compensating devices for voltage and reactive power losses
Abstract
The distribution network of potash mines is characterized by great length and energy intensity. Therefore, the voltage value in remote sections of the network often reaches values unacceptable under GOST. To compensate for voltage losses in the distribution networks of potash mines, the following devices can be used: booster transformers BDT; series capacitors SC; parallel sources of reactive power. …
Область исследования:
(Archived) Without section
Funding:
None
References
- Soldatkina L.A. Voltage regulation in urban networks. M., Energia, 1967. (in Russian)
- Belousov V.S., Zolotareva O.N. Volt-additive balancing transformer. – Izv. vuzov, Energetika, 1972, No. 8. (in Russian)
- Pobul G.H., Romanov A.D. Experience of application of longitudinal capacitive compensation installations for increasing the capacity of high-voltage distribution networks. - , Elektricheskie stantsii, 1972, No. 5. (in Russian)
Similar articles
Induction machine equations for the synthesis of frequency control systems
1979 I. M. Stolyarov, T. O. Rosso
Ways to improve train traffic safety in the automation of electric locomotive haulage
1979 O. B. Lakota, V. N. Kordakov
Analysis of mine distribution networks with longitudinal-transverse compensation
1979 V. M. Kvyatkovsky, N. V. Nefedova, Ya. E. Shklyarsky
Electro-optical device for galvanic isolation device in voltage regulator circuits
1979 K. A. Ananyev, S. A. Konovalova, N. V. Nefedova