Investigation of the lifting capacity of a hoisting installation with a flexible imported organ
Authors:
Abstract
Construction and operation of underground structures are always associated with the use of lifting machines. The most widespread at modern enterprises are machines with friction pulley.
Область исследования:
(Archived) Without section
Funding:
None
References
- A.s. 839997 (USSR); A.s. 848465 (USSR).
- Bely V.D., Naidenko I.S. Mine multi-rope hoisting installations, M., Nedra, 1966.
- Verstakov G.V., Stepanov A.G. Mine hoisting installations, Perm, PH of Perm Polytechnic, Inst., 1969. Part I.
- Fedorova Z.M. Mine stationary installations. M., Nedra, 1966.
Similar articles
Investigation of parameters of hydraulic impulsators for hydraulic mines
1983 A. B. Nezametdinov, A. S. Smorodin
Hydraulic cleaning of internal surfaces of compressor pipes
1983 Yu. G. Chernyshev, V. G. Shatsillo, M. B. Wisblat
Maximum watering of wells at mechanized charging with hot pouring water-filled explosives through a water column
1983 K. A. Dolgov, S. V. Krasavin