Submit an Article
Become a reviewer
Vol 97
Pages:
30-33
Download volume:
RUS
Article

Maximum watering of wells at mechanized charging with hot pouring water-filled explosives through a water column

Authors:
K. A. Dolgov
S. V. Krasavin
Date submitted:
1982-09-27
Date accepted:
1982-11-20
Date published:
1983-05-23

Abstract

In practice, two main methods of mechanized charging of wells are known: from the wellhead and from the bottom hole. With increasing depth of development at quarries the number of watered wells is increasing, which significantly changes the technology of charging wells with hot pouring water-filled explosives (HLWFE).

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 97

Similar articles

Peculiarities of wear of cascade devices and ways of their protection on difficult routes
1983 V. N. Pokrovskaya, L. G. Gambaryan, E. V. Sergeev
Equations of transition curves of wheel teeth cut by a rack-and-pinion producing contour with combined profile displacement
1983 I. P. Ivanov
On the determination of the reduced mass of a mine hoisting installation
1983 V. A. Kazanov
Rational rate of hundredth air consumption in pneumatic percussion machines
1983 R. N. Tunkel, I. A. Shelepanov
Hydraulic cleaning of internal surfaces of compressor pipes
1983 Yu. G. Chernyshev, V. G. Shatsillo, M. B. Wisblat
Quarry plants on the basis of axial fans
1983 E. V. Parakhonsky