Article

Improvement of tying schemes for drilling with core transporting hydraulics

Authors:
V. A. Blinov
Date submitted:
1984-09-19
Date accepted:
1984-11-17
Date published:
1985-11-27

Abstract

Since the second half of 1983 at the coal fields of Vorkutinskaya GRE the KPS-300 unit has been mastered. Already drilled more than 7 thousand meters of pilot wells, the average depth of which was 110 meters, the maximum - 185 meters.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 105

Similar articles

Methodology of well trajectory design on computer program
1985 E. F. Alexandrov, L. P. Gorkov, E. I. Slepova, G. K. Shcherbakov
About dependence of wellbore stability on the degree of ignimbrite argyllization on the example of one field of the North-East.
1985 V. G. Portnov, D. I. Beresneva, V. P. Gnedina, Yu. M. Chashinov
Results of experimental studies of borehole wall stability drilled in the ice massif
1985 V. M. Pashkevich
Analysis and calculation of the temperature field in the diamond drill bit body
1985 B. B. Kudryashov, A. A. Yakovlev
Gas-volume express method of carbonativity determination in argillites
1985 I. V. Godun, A. N. Kholodok
Pressure in the foam flow at water penetrations in a borehol
1985 A. M. Yakovlev, A. F. Kryuchkov