Submit an Article
Become a reviewer
Vol 105
Pages:
114-116
Download volume:
RUS
Article

Improvement of tying schemes for drilling with core transporting hydraulics

Authors:
V. A. Blinov
Date submitted:
1984-09-19
Date accepted:
1984-11-17
Date published:
1985-11-27

Abstract

Since the second half of 1983 at the coal fields of Vorkutinskaya GRE the KPS-300 unit has been mastered. Already drilled more than 7 thousand meters of pilot wells, the average depth of which was 110 meters, the maximum - 185 meters.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 105

Similar articles

Methodology of well trajectory design on computer program
1985 E. F. Alexandrov, L. P. Gorkov, E. I. Slepova, G. K. Shcherbakov
Investigation of technological parameters of well plugging process
1985 N. I. Nikolaev, V. I. Kovalenko
Formation of the average value of the mechanical speed of diamond drilling
1985 A. V. Sakharov
Influence of properties of flushing agents on the process of well bottom hole cleaning
1985 N. D. Mikhailova
Evaluation of the efficiency of the design schemes of the automated underwater drilling machine
1985 V. Ya. Kipovsky, I. G. Shelkovnikov, S. O. Kochetov
Calculation of the working process of a compressor with a liquid piston for gas-liquid systems
1985 V. G. Vartykyan, N. S. Vulisanov, A. I. Kirsanov, N. I. Slyusarev, O. Yu. Ustyushenkova