Improvement of tying schemes for drilling with core transporting hydraulics

Authors:
V. A. Blinov
Date submitted:
1984-09-19
Date accepted:
1984-11-17
Date published:
1985-11-27

Abstract

Since the second half of 1983 at the coal fields of Vorkutinskaya GRE the KPS-300 unit has been mastered. Already drilled more than 7 thousand meters of pilot wells, the average depth of which was 110 meters, the maximum - 185 meters.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 105

Similar articles

Influence of properties of flushing agents on the process of well bottom hole cleaning
1985 N. D. Mikhailova
Justification of the experimental research methodology of the electrothermal drilling method
1985 Vladimir S. Litvinenko, V. K. Chistyakov, G. S. Brodov
Methodology of well trajectory design on computer program
1985 E. F. Alexandrov, L. P. Gorkov, E. I. Slepova, G. K. Shcherbakov
Some issues of high speed diamond drilling
1985 G. A. Blinov, V. I. Vasiliev
Experimental studies of resistances during the movement of removable tools in drill pipes
1985 V. P. Onishchin, N. I. Kornilov, V. V. Yakovenko
Change of permeability of reservoirs in downhole zones of hydrogeological wells during drilling by different methods
1985 V. A. Berezhnoy, V. V. Antonov, Yu. M. Pariysky