Experimental studies of resistances during the movement of removable tools in drill pipes
Abstract
When drilling vertical and declined wells, the volumetric tool takes the working position under the action of its own gravity. Determination of the dependence of the resistance coefficient CR, fluid resistance force FC and speed of movement of the removable tool v on its weight, length, angle of inclination of the well, viscosity of the flushing fluid and the size of the annular gap was carried out on a specially made experimental stand by the method of falling weight.
Область исследования:
(Archived) Without section
References
- Isaev M.I., Onishchin V.P. Drilling of wells with removable core receivers. L., Nedra, 1975.
- Loytsyansky L.G., Lurie A.I. Course of Theoretical Mechanics. M., Nauka, 1983.
- Targ S.M. Basic Problems of the Theory of Laminar Currents. M., Gostekhteoretizdat, 1951.
Similar articles
Results of experimental studies of borehole wall stability drilled in the ice massif
1985 V. M. Pashkevich
Analysis and calculation of the temperature field in the diamond drill bit body
1985 B. B. Kudryashov, A. A. Yakovlev
About dependence of wellbore stability on the degree of ignimbrite argyllization on the example of one field of the North-East.
1985 V. G. Portnov, D. I. Beresneva, V. P. Gnedina, Yu. M. Chashinov