Submit an Article
Become a reviewer
Vol 105
Pages:
34-37
Download volume:
RUS
Article

Calculation of the working process of a compressor with a liquid piston for gas-liquid systems

Authors:
V. G. Vartykyan
N. S. Vulisanov
A. I. Kirsanov
N. I. Slyusarev
O. Yu. Ustyushenkova
Date submitted:
1984-09-15
Date accepted:
1984-11-14
Date published:
1985-11-27

Abstract

To improve the technological processes of drilling in difficult geological and technical conditions by using foam flushing systems (FFS) requires compressed gas of medium or high pressure. A new direction in the search for effective ways of obtaining FPS was the use for these purposes of compressor-compression devices (CCD), implemented on the bases of drilling pumps.

Область исследования:
(Archived) Without section
Go to volume 105

Similar articles

Results of field tests of the high-frequency thermo-drilling complex TBS-112 HF while drilling a deep borehole in a low-temperature glacier cover (Vostok Station).
1985 E. A. Zagrivny
Results of experimental studies of borehole wall stability drilled in the ice massif
1985 V. M. Pashkevich
Study of physical and chemical properties of plugging systems based on their electrical conductivity
1985 S. N. Afanasyev, L. A. Tereshenko, I. L. Eberling
Methodology of well trajectory design on computer program
1985 E. F. Alexandrov, L. P. Gorkov, E. I. Slepova, G. K. Shcherbakov
Some issues of high speed diamond drilling
1985 G. A. Blinov, V. I. Vasiliev
Gas-volume express method of carbonativity determination in argillites
1985 I. V. Godun, A. N. Kholodok