Submit an Article
Become a reviewer
Vol 105
Pages:
34-37
Download volume:
RUS
Article

Calculation of the working process of a compressor with a liquid piston for gas-liquid systems

Authors:
V. G. Vartykyan
N. S. Vulisanov
A. I. Kirsanov
N. I. Slyusarev
O. Yu. Ustyushenkova
Date submitted:
1984-09-15
Date accepted:
1984-11-14
Date published:
1985-11-27

Abstract

To improve the technological processes of drilling in difficult geological and technical conditions by using foam flushing systems (FFS) requires compressed gas of medium or high pressure. A new direction in the search for effective ways of obtaining FPS was the use for these purposes of compressor-compression devices (CCD), implemented on the bases of drilling pumps.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 105

Similar articles

Methodology of well trajectory design on computer program
1985 E. F. Alexandrov, L. P. Gorkov, E. I. Slepova, G. K. Shcherbakov
Improvement of tying schemes for drilling with core transporting hydraulics
1985 V. A. Blinov
Some issues of high speed diamond drilling
1985 G. A. Blinov, V. I. Vasiliev
Mathematical model of heat and mass transfer processes during fusion drilling of rocks
1985 V. K. Chistyakov
Estimation of hydraulic resistances at pneumatic impact drilling with foam
1985 V. Ya. Klimov
Gas-volume express method of carbonativity determination in argillites
1985 I. V. Godun, A. N. Kholodok