Submit an Article
Become a reviewer
Vol 105
Pages:
34-37
Download volume:
RUS
Article

Calculation of the working process of a compressor with a liquid piston for gas-liquid systems

Authors:
V. G. Vartykyan
N. S. Vulisanov
A. I. Kirsanov
N. I. Slyusarev
O. Yu. Ustyushenkova
Date submitted:
1984-09-15
Date accepted:
1984-11-14
Date published:
1985-11-27

Abstract

To improve the technological processes of drilling in difficult geological and technical conditions by using foam flushing systems (FFS) requires compressed gas of medium or high pressure. A new direction in the search for effective ways of obtaining FPS was the use for these purposes of compressor-compression devices (CCD), implemented on the bases of drilling pumps.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 105

Similar articles

Pressure in the foam flow at water penetrations in a borehol
1985 A. M. Yakovlev, A. F. Kryuchkov
Gas-volume express method of carbonativity determination in argillites
1985 I. V. Godun, A. N. Kholodok
Improvement of tying schemes for drilling with core transporting hydraulics
1985 V. A. Blinov
Methodology of well trajectory design on computer program
1985 E. F. Alexandrov, L. P. Gorkov, E. I. Slepova, G. K. Shcherbakov
Justification of the experimental research methodology of the electrothermal drilling method
1985 Vladimir S. Litvinenko, V. K. Chistyakov, G. S. Brodov
Experimental studies of resistances during the movement of removable tools in drill pipes
1985 V. P. Onishchin, N. I. Kornilov, V. V. Yakovenko