Submit an Article
Become a reviewer
Vol 105
Pages:
34-37
Download volume:
RUS
Article

Calculation of the working process of a compressor with a liquid piston for gas-liquid systems

Authors:
V. G. Vartykyan
N. S. Vulisanov
A. I. Kirsanov
N. I. Slyusarev
O. Yu. Ustyushenkova
Date submitted:
1984-09-15
Date accepted:
1984-11-14
Date published:
1985-11-27

Abstract

To improve the technological processes of drilling in difficult geological and technical conditions by using foam flushing systems (FFS) requires compressed gas of medium or high pressure. A new direction in the search for effective ways of obtaining FPS was the use for these purposes of compressor-compression devices (CCD), implemented on the bases of drilling pumps.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 105

Similar articles

Mathematical model of heat and mass transfer processes during fusion drilling of rocks
1985 V. K. Chistyakov
Saturation of drill bits with bulk diamonds of different grain size
1985 L. K. Gorshkov
Results of field tests of the high-frequency thermo-drilling complex TBS-112 HF while drilling a deep borehole in a low-temperature glacier cover (Vostok Station).
1985 E. A. Zagrivny
Experimental studies of resistances during the movement of removable tools in drill pipes
1985 V. P. Onishchin, N. I. Kornilov, V. V. Yakovenko
Mathematical model of the process of melting of caverns in glacial rock
1985 A. A. Zemtsov, V. A. Chugunov
Study of physical and chemical properties of plugging systems based on their electrical conductivity
1985 S. N. Afanasyev, L. A. Tereshenko, I. L. Eberling