Submit an Article
Become a reviewer
A. A. Tyutrin
A. A. Tyutrin
Associate Professor, Ph.D.
Irkutsk National Research Technical University
Associate Professor, Ph.D.
Irkutsk National Research Technical University
Irkutsk
Russia

Articles

Metallurgy and concentration
  • Date submitted
    2019-04-28
  • Date accepted
    2019-06-28
  • Date published
    2019-10-27

Determination of Optimal Fluorine Leaching Parameters from the Coal Part of the Waste Lining of Dismantled Electrolytic Cells for Aluminum Production

Article preview

When aluminum is obtained by electrolysis of cryolite-alumina melts when the baths are sent for capital repairs, a solid technogenic product is formed – waste lining of electrolytic cells (WLEC). The volume of formation of WLEC is 30-50 kg per 1 ton of aluminum. Currently, it is mainly stored at landfills near industrial enterprises, causing harm to the environment. However, this technogenic raw material contains valuable components (fluorine, aluminum, sodium) that can be extracted to produce fluoride salts, which are in demand during the electrolytic production of aluminum. The objects of research were samples of the coal part of the waste lining of dismantled S-8BM (E) type electrolytic cells of «RUSAL Krasnoyarsk» JSC (Krasnoyarsk) of RUSAL company. According to the X-ray experiment diffraction analysis (using a Bruker D8 ADVANCE diffractometer) of the phase composition of the samples, it was found that the main fluorine-containing compounds are cryolite, chiolite, sodium and calcium fluorides. The total fluorine content in the studied samples averaged 13.1 %. We conducted studies on the leaching of fluorine from WLEC with a solution of caustic alkali (NaOH concentration – 17.5 g/dm 3 ). The process was carried out in a mechanically agitated reactor using a BIOSAN MM-1000 top drive laboratory stirrer with a two-blade nozzle. By the method of mathematical planning of a three-factor experiment, the mutual influence of three leaching conditions on the optimization parameter was established – the extraction of fluorine in solution (in percent). The maximum recovery of fluorine from WLEC to the leach solution averaged 86.4 % and was achieved with the following indicators:processtemperature–95 ° C, the ratio ofliquidtosolidphase–9:1,duration– 210 min.

How to cite: Nemchinova N.V., Tyutrin A.A., Somov V.V. Determination of Optimal Fluorine Leaching Parameters from the Coal Part of the Waste Lining of Dismantled Electrolytic Cells for Aluminum Production // Journal of Mining Institute. 2019. Vol. 239. p. 544-549. DOI: 10.31897/PMI.2019.5.544