Submit an Article
Become a reviewer
V. D. Fisunov
V. D. Fisunov

Co-authors

Articles

Article
  • Date submitted
    1968-07-22
  • Date accepted
    1968-09-10

Investigations of contouring borehole charge designs for vertical shaft sinking

Article preview

The practice of construction of vertical shafts by drilling and blasting method in the conditions of combine “Rostovshahtostroy” shows that the improvement of parameters of drilling and blasting works allows to reduce the deviation of actual cross-sections from the design. At the same time it is not accompanied by reduction of irregularities of the rock walls of the shaft, and destruction of rocks in outcrops remains still significant.

How to cite: Fisunov V.D. Investigations of contouring borehole charge designs for vertical shaft sinking // Journal of Mining Institute. 1969. Vol. 57. Iss. 1. p. 89-94.
Article
  • Date submitted
    1968-07-13
  • Date accepted
    1968-09-05

Economic efficiency of contour blasting during sinking of vertical shafts

Article preview

Since 1966, the Leningrad Mining Institute together with Rostovshahtostroy Combine have been conducting research to determine the actual over-excavation of rock during the sinking of vertical shafts and to find the optimal parameters of contour blasting, contributing to the reduction of excessively excavated rock.

How to cite: Fisunov V.D., Smorodinov V.I., Golovko N.N. Economic efficiency of contour blasting during sinking of vertical shafts // Journal of Mining Institute. 1969. Vol. 57. Iss. 1. p. 95-98.