Submit an Article
Become a reviewer
Yu. P. Boytsov
Yu. P. Boytsov

Co-authors

Articles

Article
  • Date submitted
    2011-08-29
  • Date accepted
    2011-10-02

Concerning the possibility of an effective hadfield's steel cold-work hardening in the working conditions of the lining of spherical mills

Article preview

Taking a grinding of coal ball mill (type: BTM 400/800) operating without rocks as an example it is shown that a bombardment of the armour by grinding bodies made of steel 110G13L directly is capable to raise its hardness from 200 to 320HB at the depth of the cold-hardened layer up to 6,7 mm that will approximately 2 times increase its firmness to an abrasion. The time needed for the realization of an effective bombardment is 11 minutes, the period between strengthening cold – work hardenings is 25 days.

How to cite: Bochkov V.S., Bolobov V.I., Batalov A.P., Boitsov Y.P. Concerning the possibility of an effective hadfield’s steel cold-work hardening in the working conditions of the lining of spherical mills // Journal of Mining Institute. 2012. Vol. 196. p. 226-230.