Submit an Article
Become a reviewer
V. N. Karelin
V. N. Karelin
ZF OJSC MMK «Norilsk Nickel»
ZF OJSC MMK «Norilsk Nickel»

Articles

Innovation in designing of mining plants
  • Date submitted
    2011-10-24
  • Date accepted
    2011-12-24
  • Date published
    2012-04-01

Optimization of protective pillars parameters of mine shafts at the ore mines of OJSC «MMK «Norilsk Nickel»

Article preview

The Article presents the results of long-term investigations of the problem concerning the protection of shafts with pillars of reduced sizes under conditions of the Talnakh and Oktiabrsky deposits. The principal potentiality of partial mining of shaft-bottom pillars VS-3 and GS has been proved at the Oktiabrsky ore mine. Certain recommendations are given on optimization of parameters of shaft-bottom protective pillars.

How to cite: Zuev Y.I., Zelentsov S.N., Kuznetsova E.I., Zvezdkin V.A., Karelin V.N. Optimization of protective pillars parameters of mine shafts at the ore mines of OJSC «MMK «Norilsk Nickel» // Journal of Mining Institute. 2012. Vol. 198. p. 7.
Innovation in designing of mining plants
  • Date submitted
    2011-10-12
  • Date accepted
    2011-12-25
  • Date published
    2012-04-01

Problems and ways of exploration of the raw material resources base of the Subarctic branch of MMK «Norisk nickel»

Article preview

Consideration is given to the geological, mining and operating conditions of the Norilsk industrial district. The analysis is made of the present-day state of mining production of the subarctic branch of MMK «Norilsk Nickel». The principal trends in the safe and efficient exploration of the raw material resources base have been stated within the Norilsk industrial district .

How to cite: Muravev E.I., Karelin V.N., Shabarov A.N. Problems and ways of exploration of the raw material resources base of the Subarctic branch of MMK «Norisk nickel» // Journal of Mining Institute. 2012. Vol. 198. p. 126.
Innovation in designing of mining plants
  • Date submitted
    2011-10-12
  • Date accepted
    2011-12-10
  • Date published
    2012-04-01

To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine

Article preview

Factors complicating drifting processes and barring in situ, disintegrated by tectonic burst- ing are considered. The analysis of stress-strain state formation of rock massif in the vicinity of tectonic disturbance is presented and practical recommendations concerning drifting and barring are given.

How to cite: Zvezkin V.A., Karelin V.N., Mushtekenov T.S. To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine // Journal of Mining Institute. 2012. Vol. 198. p. 131.
Geomechanics
  • Date submitted
    2010-08-04
  • Date accepted
    2010-10-29
  • Date published
    2011-02-01

Management stress-strain state block structure partition arrays in difficult geological and mining engineering conditions of mine Тalnakh

Article preview

The reasons that complicate the process of elaboration dividing arrays of deep mines Talnakh. The analysis of the formation of stress-strain state dividing arrays during the development of treatment work. Practical advice on management strains and stresses in underworking Block structures dividing arrays. 

How to cite: Zvezdkin V.A., Karelin V.N., Anokhin A.G., Nagovitsin Y.N. Management stress-strain state block structure partition arrays in difficult geological and mining engineering conditions of mine Тalnakh // Journal of Mining Institute. 2011. Vol. 190. p. 263.