-
Date submitted2021-05-12
-
Date accepted2022-05-11
-
Date published2023-07-19
Application of the cybernetic approach to price-dependent demand response for underground mining enterprise electricity consumption
The article considers a cybernetic model for the price-dependent demand response (DR) consumed by an underground mining enterprise (UGME), in particular, the main fan unit (MFU). A scheme of the model for managing the energy consumption of a MFU in the DR mode and the implementation of the cybernetic approach to the DR based on the IoT platform are proposed. The main functional requirements and the algorithm of the platform operation are described, the interaction of the platform with the UGME digital model simulator, on which the processes associated with the implementation of the technological process of ventilation and electricity demand response will be simulated in advance, is shown. The results of modeling the reduction in the load on the MFU of a mining enterprise for the day ahead are given. The presented solution makes it possible to determine in advance the necessary power consumption for the operation of the main power supply unit, manage its operation in an energy-saving mode and take into account the predicted changes in the planned one (e.g., when men hoisting along an air shaft) and unscheduled (e.g., when changing outdoor air parameters) modes. The results of the study can be used to reduce the cost of UGME without compromising the safety of technological processes, both through the implementation of energy-saving technical, technological or other measures, and with the participation of enterprises in the DR market. The proposed model ensures a guaranteed receipt of financial compensation for the UGME due to a reasonable change in the power consumption profile of the MFU during the hours of high demand for electricity, set by the system operator of the Unified Energy System.
-
Date submitted2020-10-05
-
Date accepted2021-03-30
-
Date published2021-06-24
Improving the efficiency of relay protection at a mining and processing plant
The paper presents the results of constructing effective relay protection in the power supply system of a mining and processing plant (MPP). A brief description of the MPP is given, the power supply and substitution circuits used to calculate the short-circuit currents are given. A statistical analysis of failures in the electric network of the MPP has been carried out, which makes it possible to draw conclusions about the nature of failures ranges. Analysis of the registered faults shows that a significant part of them are line-to-earth faults, which in most cases turn into multiphase short circuits, which are interrupted by overcurrent protection. In order to improve the efficiency and reliability of the relay protection, the power supply scheme of the MPP was refined and analyzed. The calculation of the short-circuit currents was made, which made it possible to calculate the settings of the relay protection and give recommendations on the place of its installation and adjustment in order to ensure the normal operation of electricity consumers. To reduce the number of failures to the cable insert on the line leaving the administrative and household complex (AHC), and to increase the reliability of power supply to consumers, it is advisable to divide the capacities of the existing 10 kV line into two parallel ones by laying a second line. It is recommended to install a current cut-off on the line outgoing to the AHC, the feasibility of the installation of which was shown by calculations. This will reduce the chance of failures to the cable gland. Data on the setting currents of overcurrent protection and current cut-off are given on the selectivity card.
-
Date submitted2019-03-31
-
Date accepted2019-08-25
-
Date published2020-02-25
Cascade frequency converters control features
The structures of systems with high-voltage cascade frequency converters containing multi-winding transformers and low-voltage low-power converters connected in series at each output phase of the load are considered. Low-voltage blocks contain three-phase diode or active rectifiers, DC capacitor filters, single-phase stand-alone voltage inverters and block disconnecting devices in partial modes (in case of failure when part of the blocks are disconnected). The possibilities of operation of cascade converters are determined, equations for correcting tasks to units in partial modes are given, tables of correction of tasks with estimates of achievable load characteristics are proposed. The results of experiments on the model of a powerful installation with a cascade frequency converter are presented, confirming the possibility of ensuring the symmetry of the load currents when disconnecting part of the blocks and the asymmetry of the circuit.
-
Date submitted2019-03-13
-
Date accepted2019-05-18
-
Date published2019-08-23
Improving the Operation of Pump-ejector Systems at Varying Flow Rates of Associated Petroleum Gas
- Authors:
- A. N. Drozdov
- Ya. A. Gorbyleva
Application of pump-ejector systems for the utilization of associated petroleum gas reduces the negative environmental impact of its flaring, and also allows the implementation of a promising method of water-gas stimulation of the formation, which effectively increases oil recovery. Equally feasible is the use of pump-ejector systems in the operation of oil wells with a high gas factor, low bottomhole pressures to increase production rates and increase the turnaround period. A significant change in the flow rate of associated petroleum gas over time is a serious problem for the efficient operation of pump-ejector systems for the utilization of associated petroleum gas. To ensure the rational operation of the pump-ejector system under the condition of a variable flow rate of associated petroleum gas, experimental studies of a liquid-gas ejector characteristics were carried out. The article presents the results of the research, obtained pressure-energy characteristics of the investigated jet apparatus at various values of the working stream pressure before the ejector nozzle. The possibility of adapting the operation of pump-ejector systems to changes in the flow rate of the pumped gas, regulated by the working pressure and fluid flow rate through the nozzle is revealed. To successfully change the operation of the pump-ejector system, the possibility of frequency regulation of the pump shaft's rotation at changing gas flow rates in a small range of values is considered. With a large difference in the values of the possible flow rate of associated petroleum gas, it is recommended that frequency regulation should be supplemented by periodic short-term operation. The possibility of increasing the efficiency of the pump-ejector system when using salt solutions with a concentration that contributes to the suppression of bubble coalescence is noted.
-
Date submitted2015-12-29
-
Date accepted2016-02-21
-
Date published2016-12-23
Poorly studied phenomena in geoelectrics
- Authors:
- V. S. Mogilatov
Undoubtedly, modern geoelectric technologies emerge in the result of the development of traditional approaches and techniques. However of more interest is the appearance of completely new technologies based on new effects and new models of interaction of geological medium and electromagnetic field. The author does not commit to indicate principally new directions, but only wants to discuss some poorly known facts from the theory and practice of geoelectrics. The outcome of this study could be considered attracting the attention of experts to non-traditional signals in geoelectrics. The reviewed phenomena of interest, not fully implemented in practice in the author’s opinion, are field split into two polarizations: transverse electric (the ТЕ-field) and transverse magnetic (the ТМ-field), then some poorly known properties of ТМ-field, the role of bias currents, the anisotropy of horizontal resistances, the role of geomagnetic field in geoelectric sounding, the unique resolution of CSEM (Controlled Source Electro-Magnetic) techniques at sea.