Submit an Article
Become a reviewer

Search articles for by keywords:
setting

Geotechnical Engineering and Engineering Geology
  • Date submitted
    2022-09-26
  • Date accepted
    2023-09-20
  • Date published
    2024-04-25

Technology of absorption elimination with cross-linking plugging material based on cement and cross-linked polymer

Article preview

The peculiarity of the geological structure of carbonate reservoirs is their complex permeability and porosity characteristics, reflecting the simultaneous presence of cavities variety (fractures, caverns, pores). Loss of circulation during penetration of fractured rock intervals significantly increases well construction time due to lack of efficient plugging isolation compositions. The main disadvantages of traditional compositions are high sensitivity to dilution in the process of their injection into the absorption zone, as well as insufficient structural strength to prevent the isolation composition from spreading during the induction period. For efficient isolation of catastrophic absorption zones in conditions of high opening of absorption channels a new cross-linking plugging isolation composition has been developed, which allows to exclude disadvantages of traditional isolation compositions. Application of the composition will allow to reduce the injection volume of the isolation composition and the time of isolation works due to its resistance to dilution and movement of formation water in the absorption interval.

How to cite: Predein A.А., Garshina О.V., Melekhin A.А. Technology of absorption elimination with cross-linking plugging material based on cement and cross-linked polymer // Journal of Mining Institute. 2024. Vol. 266 . p. 295-304. EDN BPUQNV
Electromechanics and mechanical engineering
  • Date submitted
    2020-10-05
  • Date accepted
    2021-03-30
  • Date published
    2021-06-24

Improving the efficiency of relay protection at a mining and processing plant

Article preview

The paper presents the results of constructing effective relay protection in the power supply system of a mining and processing plant (MPP). A brief description of the MPP is given, the power supply and substitution circuits used to calculate the short-circuit currents are given. A statistical analysis of failures in the electric network of the MPP has been carried out, which makes it possible to draw conclusions about the nature of failures ranges. Analysis of the registered faults shows that a significant part of them are line-to-earth faults, which in most cases turn into multiphase short circuits, which are interrupted by overcurrent protection. In order to improve the efficiency and reliability of the relay protection, the power supply scheme of the MPP was refined and analyzed. The calculation of the short-circuit currents was made, which made it possible to calculate the settings of the relay protection and give recommendations on the place of its installation and adjustment in order to ensure the normal operation of electricity consumers. To reduce the number of failures to the cable insert on the line leaving the administrative and household complex (AHC), and to increase the reliability of power supply to consumers, it is advisable to divide the capacities of the existing 10 kV line into two parallel ones by laying a second line. It is recommended to install a current cut-off on the line outgoing to the AHC, the feasibility of the installation of which was shown by calculations. This will reduce the chance of failures to the cable gland. Data on the setting currents of overcurrent protection and current cut-off are given on the selectivity card.

How to cite: Klyuev R.V., Bosikov I.I., Gavrina O.A. Improving the efficiency of relay protection at a mining and processing plant // Journal of Mining Institute. 2021. Vol. 248 . p. 300-311. DOI: 10.31897/PMI.2021.2.14
Problems in geomechanics of technologeneous rock mass
  • Date submitted
    2009-07-20
  • Date accepted
    2009-09-24
  • Date published
    2010-04-22

Methods for presetting of artificial yielding to anthracite pillars

Article preview

The article contains the results of in situ investigation of influence of yielding pillars on the stability of protected workings with different modes of preset yielding. Graphs of roof movements in the workings protected with yielding pillars, are given.

How to cite: Stradanchenko S.G., Titov N.V., Turuk Y.V. Methods for presetting of artificial yielding to anthracite pillars // Journal of Mining Institute. 2010. Vol. 185 . p. 158-160.