Economical aspects in the developments оf fuel & energy complex
-
Date submitted2008-11-01
-
Date accepted2009-01-22
-
Date published2009-12-11
Rate setting of electrical equipment reserve stocks on the enterprises of the gas main transport
- Authors:
- L. V. Vazhenina
Article preview
Minimization of economic losses from downtime of equipment and, first of all, off-schedule (breakdowns, accidents) is an actual problem whose solution can be achieved by the development and creation of a reserve stocks (irreducible level) materials and spare parts of electrical equipment. As a result of the study and comparative analysis of different methods for determining the amount of the reserve stocks has been concluded that these approaches are not fully reflect the real needs of the enterprise. In this regard, has developed an optimal method for determining the amount of irreducible level of reserve stocks of electrical equipment, taking into account the rational order of delivery of equipment, spare parts.
How to cite:
Vazhenina L.V. Rate setting of electrical equipment reserve stocks on the enterprises of the gas main transport // Journal of Mining Institute. 2009. Vol. 184 . p. 121-124.
1 - 1 of 1 items