Submit an Article
Become a reviewer

Search articles for by keywords:
экскавация

Mining
  • Date submitted
    2017-12-28
  • Date accepted
    2018-03-03
  • Date published
    2018-06-22

Special features of a structure of technical operations for peat excavation with stage dewatering

Article preview

A method of development of a technology of peat extraction for intensifying of dewatering which involves drying of peat raw materials in thick layers with a layer-by-layer harvesting into large-sized roll with further delivery to the field storage unit of the enlarged sizes is presented in the paper. Throughout the year storage raw materials may be transported to the customer or to the shopfloor for further processing. Considering dimension and mass characteristics, a crumbed peat of various moisture capacity is a major type of products to be of high demand. On the basis of the results of scientific studies regarding gravity dewatering of peat and its drying in field environment, the ways of intensifying of field dewatering of peat for extraction at shallow-peat lands and fine-limit fields are proposed. The presented results of the experimental performance of a technology of peat drying in thick layers with a layer-by-layer harvesting indicate an increase of seasonal harvesting and a decrease of the influence of unfavorable meteorological factors on the stability of the extraction process. Performed investigations allowed to develop a structure of technical operations for peat excavation with the stage dewatering in spreading and intermediate storage units providing rational state of the extraction process regarding a complex of technical factors. A suggested scheme of a process area for a primary and secondary period of deposit exploitation by a technology of peat excavation is considered.

How to cite: Kremcheev E.A. Special features of a structure of technical operations for peat excavation with stage dewatering // Journal of Mining Institute. 2018. Vol. 231 . p. 225-234. DOI: 10.25515/PMI.2018.3.225
Mining
  • Date submitted
    2016-09-15
  • Date accepted
    2016-11-07
  • Date published
    2017-02-22

Open-pit mining of lignin waste storage

Article preview

The purpose of this paper is to develop performance criteria for fleet selection in surface mining of lignin as a raw material for factory-made fuel. The East Siberian Biotechnical Plant (ESBP) proposes to close the Lignin Waste Storage (LWS) at Tulun, Irkutsk Region of Russia. The LWS is a 9.6 ha facility used for the long-term storage of hydrolysis lignin and some fly ash. The project provided whole-year open-pit mining of lignin storage with one mining ledge within 3 years. Productivity – 1500 t/day or 447 000 t/year. Excavated lignin will be stockpile on the Pellet Plant territory for later processing. Part of this closure effort would involve constructing an artificial reservoir on the place of LWS. The objectives of this project were as follows: determine equipment needs and develop optimal procedures for the lignin excavation and transportation. Lignin moving may include site preparation, excavation, transportation and road surfacing. Lignin excavation is conduct by using techniques similar to those used for open-pit mining of peat. For this project, the excavator is the most important piece of equipment required for lignin removal and handling. The mining process consist of excavating the lignin (using Kraneks ЕК-270LC) and hauling it to pellet plant via six off-road tractors&semitrailers (John Deere 7730& ISON-8520).

How to cite: Mikhailov A.V. Open-pit mining of lignin waste storage // Journal of Mining Institute. 2017. Vol. 223 . p. 44-50. DOI: 10.18454/PMI.2017.1.44