Natural ventilation of gas space in reservoir with internal floating roof

Article preview

The article deals with safe operation issues of vertical steel reservoirs with an internal floating roof when storing volatile oil products. The purpose of the work is to study the influence of ventilation openings area and wind speed on the duration of explosive state of vertical reservoirs with an internal floating roof. The influence of ventilation pipes' dimensions and the wind speed on the duration of explosive state of the reservoir has been studied. Method for calculating this time is proposed. It is shown that natural ventilation of the reservoir gas space is caused by the effect of two forces, which are formed due to: 1) the density difference between the vapor-air mixture in the reservoir and outside air; 2) wind pressure occurring on the roof of the reservoir. An algorithm for calculating the duration of reservoir being in an explosive state with wind pressure and no wind is obtained. The greater the difference in geodetic marks of the central and peripheral nozzles, the more efficient the ventilation. This distance will be greatest if the lower ventilation pipes are located on the upper belt of the reservoir or the reservoir is equipped with an air drain. Increase in wind speed of more than 10 m/s does not significantly affect the duration of the reservoir being in an explosive state. Increasing the diameter of the central nozzle from 200 to 500 mm can significantly reduce the duration of the reservoir degassing in windless weather.

How to cite: Karavaichenko M.G., Fathiev N.M. Natural ventilation of gas space in reservoir with internal floating roof // Journal of Mining Institute. 2018. Vol. 234 . p. 637-642. DOI: 10.31897/PMI.2018.6.637
Electromechanics and mechanical engineering
  • Date submitted
    2018-05-03
  • Date accepted
    2018-07-07
  • Date published
    2018-10-24

Regularities of material destruction of the impactor in repeated single punch

Article preview

The technique and the results of experiments on the study of the laws of the process of the cone-shaped tip of a freely falling impactor made of 38HM, U8, H12MF steels, subjected to typical heat treatment and additionally treated with cold, when they apply multiple (up to 10000) single impacts on granite under conditions approaching hydraulic impactor peaks. To explain the processes, we used the values of stresses σ к , arising at the contact area of the impactor and the rock, calculated using the developed mathematical model. It has been established that the process of wear of an impactor with multiple single blows proceeds in three stages separated by critical values, , which correspond to the strength characteristics of the material of the impactor demonstrated in these dynamic conditions. With a small number of strokes (n ≤ n * ) and the small size of the blunting area (stage I interaction) values σ c exceed of steel and it is exposed to local destruction at the contact site, which is recorded as a significant loss of the impactor’s mass; with n * < n ≤ n ** (stage II) the resulting stresses are not enough to destroy the material, but it is enough for its plastic deformation, accompanied by the movement of metal from the central part of the contact area to the peripheral and the destruction of part of the deformed metal by rock; with n > n ** (stage III) arising σ к do not reach the level and the decrease in the mass of the impactor is determined by the resistance of the steel to abrasion by the products of rock destruction, displaced by the impactor from the well. The treatment of impactors from all tested steels with cold leads to an increase in their wear resistance; The total depth of the holes punctured by the cold-treated H12MF steel impactor at the time of the interruption of the rock penetration is four times higher than that of the 38HM steel impactor subjected to typical heat treatment.

How to cite: Bolobov V.I., Bin L.T. Regularities of material destruction of the impactor in repeated single punch // Journal of Mining Institute. 2018. Vol. 233 . p. 525-533. DOI: 10.31897/PMI.2018.5.525
Electromechanics and mechanical engineering
  • Date submitted
    2018-01-02
  • Date accepted
    2018-03-14
  • Date published
    2018-06-22

Analysis of the options of modernization of roller-bit drilling machines with a submersible steamer

Article preview

The designs of submersible hammers and dampers protected by patents for reducing the vibration of the drilling rig of roller drill machines are proposed. The variants of modernizing drilling rigs for drilling hard rocks and faces of complex structures are considered. Particular attention is paid to the joint work of submersible shockers and pneumatic shock absorbers, the preferred schemes for the arrangement of these devices by drilling rigs are indicated. The results of experimental tests of machines with pneumatic hammers are presented to determine the vibration performance and drilling speeds. The pneumatic hammer allows increasing the speed of drilling process to the intensification of the destruction of the plain face by the shock load and the cleavage of the protrusions of the unevenness of the face, the better fitting of the bit to the face and the release of the blades or the bit pins from the drill bit. The choice of a particular type of damper or shock absorber depends on its design scheme and the possibility of changing the design of the drill string. With the complexity of installing a damping device in the mast (with significant dimensions of shock absorbers and drilling of strong heterogeneous rocks), it is advisable to use a set of tools to reduce hydraulic pulsations in the mains and cylinders of the hydraulic system by installing chokes in the oil plants and pneumatic shock absorbers. It is proposed to use the device for the development of pneumatic hammers by a patent-pending drilling method with a hollow piston filled with magnetically active heavy liquid, which will allow controlling the frequency and size of the shock pulses and partially compensating for the drill string fluctuations arising from the uneven immersion of the bit in the array . It is noted that the proposed solutions increase the drilling speed by an average of 15%.

How to cite: Yungmeister D.A., Krupenskii I., Lavrenko S.A. Analysis of the options of modernization of roller-bit drilling machines with a submersible steamer // Journal of Mining Institute. 2018. Vol. 231 . p. 321-325. DOI: 10.25515/PMI.2018.3.321