-
Date submitted2021-01-18
-
Date accepted2021-05-21
-
Date published2021-09-20
Improving the efficiency of the technology and organization of the longwall face move during the intensive flat-lying coal seams mining at the Kuzbass mines
The reasons for the lag of the indicators of the leading Russian coal mines engaged in the longwall mining of the flat-lying coal seams from similar foreign mines are considered. The analysis of the efficiency of the longwall face move operations at the JSC SUEK-Kuzbass mines was carried out. A significant excess of the planned deadlines for the longwall face move during the thick flat-lying seams mining, the reasons for the low efficiency of disassembling operations and the main directions for improving the technology of disassembling operations are revealed. The directions of ensuring the operational condition of the recovery room formed by the longwall face are considered. The recommended scheme of converged coal seams mining and a three-dimensional model of a rock mass to justify its parameters are presented. Numerical studies using the finite element method are performed. The results of modeling the stress-strain state of a rock mass in the vicinity of a recovery room formed under conditions of increased stresses from the boundary part of a previously mined overlying seam are shown. The main factors determining the possibility of ensuring the operational condition of the recovery rooms are established. It is shown that it is necessary to take into account the influence of the increased stresses zone when choosing timbering standards and organizing disassembling operations at a interbed thickness of 60 m or less. A sufficient distance from the gob of above- or undermined seams was determined to ensure the operational condition of the recovery room of 50 m, for the set-up room – 30 m. Recommendations are given for improving technology and organization of the longwall face move operations at the mines applied longwall mining of flat-lying coal seams with the formation of a recovery room by the longwall face.
-
Date submitted2014-06-24
-
Date accepted2014-08-29
-
Date published2014-12-22
Mathematical modeling of mine air conditioning in the zone of mine works
- Authors:
- A. A. Lapshin
The article addresses the topical problem of normalizing the microclimate in the deep ore mines of the Krivbas and Zaporozhsky iron ore mines. Studies of heat exchange processes in the mine workings of the deep ore mines of Krivbas and Zaporozhsky iron ore have shown considerable changes in air temperature. Moreover, as a rule, in the zone of mining works, the air temperature exceeds the permissible values of 26 °С, and at depths of 1200-1500 m reaches 28-30 °C. A method of normalization of the thermal conditions in the zone of mining works due to cooling in the irrigation chamber is presented. A mathematical model of heat exchange processes in the irrigation chamber, which allows, by simulation modeling, to establish thermal regimes corresponding to the sanitary and hygienic norms of mining operations in the conditions of deep iron ore mines, is presented.
-
Date submitted2009-07-16
-
Date accepted2009-09-10
-
Date published2010-04-22
Influence of tectonic stresses and geological disturbances in rock mass on the parameters of stress-strain state around mine workings
- Authors:
- D. N. Petrov
- I. S. Dolgy
- V. I. Ochkurov
The results of mathematical modeling of formation of stress fields in stratified rock mass under various vertical and horizontal stresses relation are presented. An assessment of influence of the presence and position of a great geological disturbance on a stress state around a mine working is considered.