Analysis of 4PP-2M roadheader operation at Lenmetrostroy mine № 516

Authors:
A. A. Khalilov
Date submitted:
1992-09-25
Date accepted:
1992-11-29
Date published:
1993-12-28

Abstract

The technology of construction of single-wall stations of the St. Petersburg Metro provides for the development of the station core, which contains the bulk of the rock excavated during the construction of the station, after the construction of the upper vault. Until recently, this work was carried out mainly with the help of jackhammers.

Область исследования:
(Archived) Without section
Go to volume 138

Similar articles

Improvement of gear hydraulic machines by meshing geometry
1993 S. L. Ivanov, I. P. Ivanov, O. A. Krasnozhon
Shot peening of drilling rods
1993 E. L. Korotkikh
Maximum stresses in tooth contact of spur gears
1993 I. P. Ivanov
Calculation of connections with guaranteed interference fit for a given probability of failure-free operation
1993 E. S. Kuznetsov
К вопросу о производительности щековой дробилки
1993 V. V. Denegin
Rational mechanical characteristic of the carriage feed drive of the AMS unit
1993 Yu. V. Lykov