Analysis of 4PP-2M roadheader operation at Lenmetrostroy mine № 516

Authors:
A. A. Khalilov
Date submitted:
1992-09-25
Date accepted:
1992-11-29
Date published:
1993-12-28

Abstract

The technology of construction of single-wall stations of the St. Petersburg Metro provides for the development of the station core, which contains the bulk of the rock excavated during the construction of the station, after the construction of the upper vault. Until recently, this work was carried out mainly with the help of jackhammers.

Область исследования:
(Archived) Without section
Go to volume 138

Similar articles

Small-sized unit for destruction of rocks of low strength
1993 A. A. Batalov, M. D. Kolomiytsov, Nguyen Khuu Lien
Press for production of double-layer fuel coal briquettes
1993 Yu. D. Tarasov, V. V. Denegin, G. V. Sokolova, Yu. S. Fedorov, Yu. N. Marusov, N. K. Ulashchik
Justification of design schemes of devices for mounting and dismantling works of mechanized complexes in mines of Pechora basin
1993 Yu. I. Rogov, D. A. Jungmeister
Statics and kinematics of vehicles with spiral-chain traction device on inclined track
1993 N. P. Boytsov, I. N. Boytsova
Maximum stresses in tooth contact of spur gears
1993 I. P. Ivanov
Methods of determining the service life of mining equipment
1993 M. D. Kolomiytsov, B. S. Makhovikov