Analysis of 4PP-2M roadheader operation at Lenmetrostroy mine № 516

Authors:
A. A. Khalilov
Date submitted:
1992-09-25
Date accepted:
1992-11-29
Date published:
1993-12-28

Abstract

The technology of construction of single-wall stations of the St. Petersburg Metro provides for the development of the station core, which contains the bulk of the rock excavated during the construction of the station, after the construction of the upper vault. Until recently, this work was carried out mainly with the help of jackhammers.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 138

Similar articles

Existence area of spur gear meshing with a given overlap coefficient
1993 S. L. Ivanov
Determining the optimal match between the average and instantaneous loads of mining machines
1993 A. M. Meshkov
Determination of bulk cargo motion parameters on curved surfaces with constant radius of curvature
1993 Yu. D. Tarasov
Automated calculation of optimal cutting modes during machining
1993 Yu. P. Boytsov
Small-sized unit for destruction of rocks of low strength
1993 A. A. Batalov, M. D. Kolomiytsov, Nguyen Khuu Lien
Calculation of parameters of wave processes at start-up of multi-drive belt conveyor
1993 M. M. Vetyukov, D. A. Jungmeister, V. A. Avdeev