Abstract

The technology of construction of single-wall stations of the St. Petersburg Metro provides for the development of the station core, which contains the bulk of the rock excavated during the construction of the station, after the construction of the upper vault. Until recently, this work was carried out mainly with the help of jackhammers.

Область исследования:
(Archived) Without section
Go to volume 138

Similar articles

To the issue of studying the loading of resilient systems of dump trucks in the process of movement
1993 N. V. Zyryanov, V. Yu. Koptev
Rational mechanical characteristic of the carriage feed drive of the AMS unit
1993 Yu. V. Lykov
Press for production of double-layer fuel coal briquettes
1993 Yu. D. Tarasov, V. V. Denegin, G. V. Sokolova, Yu. S. Fedorov, Yu. N. Marusov, N. K. Ulashchik
Statics and kinematics of vehicles with spiral-chain traction device on inclined track
1993 N. P. Boytsov, I. N. Boytsova
Calculation of parameters of wave processes at start-up of multi-drive belt conveyor
1993 M. M. Vetyukov, D. A. Jungmeister, V. A. Avdeev
Maximum stresses in tooth contact of spur gears
1993 I. P. Ivanov