Analysis of 4PP-2M roadheader operation at Lenmetrostroy mine № 516
Authors:
Abstract
The technology of construction of single-wall stations of the St. Petersburg Metro provides for the development of the station core, which contains the bulk of the rock excavated during the construction of the station, after the construction of the upper vault. Until recently, this work was carried out mainly with the help of jackhammers.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
To the issue of studying the loading of resilient systems of dump trucks in the process of movement
1993 N. V. Zyryanov, V. Yu. Koptev
Calculation of connections with guaranteed interference fit for a given probability of failure-free operation
1993 E. S. Kuznetsov
Calculation of parameters of wave processes at start-up of multi-drive belt conveyor
1993 M. M. Vetyukov, D. A. Jungmeister, V. A. Avdeev