Analysis of 4PP-2M roadheader operation at Lenmetrostroy mine № 516

Authors:
A. A. Khalilov
Date submitted:
1992-09-25
Date accepted:
1992-11-29
Date published:
1993-12-28

Abstract

The technology of construction of single-wall stations of the St. Petersburg Metro provides for the development of the station core, which contains the bulk of the rock excavated during the construction of the station, after the construction of the upper vault. Until recently, this work was carried out mainly with the help of jackhammers.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 138

Similar articles

Improvement of gear hydraulic machines by meshing geometry
1993 S. L. Ivanov, I. P. Ivanov, O. A. Krasnozhon
Automated calculation of optimal cutting modes during machining
1993 Yu. P. Boytsov
Existence area of spur gear meshing with a given overlap coefficient
1993 S. L. Ivanov
Methods of determining the service life of mining equipment
1993 M. D. Kolomiytsov, B. S. Makhovikov
Mechanization schemes for creating protective coatings on bulk material bunches
1993 P. F. Korsakov
Calculation of connections with guaranteed interference fit for a given probability of failure-free operation
1993 E. S. Kuznetsov