Submit an Article
Become a reviewer
Vol 138
Pages:
79-83
Download volume:
RUS
Article

Analysis of 4PP-2M roadheader operation at Lenmetrostroy mine № 516

Authors:
A. A. Khalilov
Date submitted:
1992-09-25
Date accepted:
1992-11-29
Date published:
1993-12-28

Abstract

The technology of construction of single-wall stations of the St. Petersburg Metro provides for the development of the station core, which contains the bulk of the rock excavated during the construction of the station, after the construction of the upper vault. Until recently, this work was carried out mainly with the help of jackhammers.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 138

Similar articles

Existence area of spur gear meshing with a given overlap coefficient
1993 S. L. Ivanov
Determining the optimal match between the average and instantaneous loads of mining machines
1993 A. M. Meshkov
Calculation of parameters of wave processes at start-up of multi-drive belt conveyor
1993 M. M. Vetyukov, D. A. Jungmeister, V. A. Avdeev
Justification of design schemes of devices for mounting and dismantling works of mechanized complexes in mines of Pechora basin
1993 Yu. I. Rogov, D. A. Jungmeister
Shot peening of drilling rods
1993 E. L. Korotkikh
Method of calculation of vector dimension chains
1993 A. P. Batalov