Analysis of 4PP-2M roadheader operation at Lenmetrostroy mine № 516

Authors:
A. A. Khalilov
Date submitted:
1992-09-25
Date accepted:
1992-11-29
Date published:
1993-12-28

Abstract

The technology of construction of single-wall stations of the St. Petersburg Metro provides for the development of the station core, which contains the bulk of the rock excavated during the construction of the station, after the construction of the upper vault. Until recently, this work was carried out mainly with the help of jackhammers.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 138

Similar articles

Small-sized unit for destruction of rocks of low strength
1993 A. A. Batalov, M. D. Kolomiytsov, Nguyen Khuu Lien
Calculation of connections with guaranteed interference fit for a given probability of failure-free operation
1993 E. S. Kuznetsov
Shot peening of drilling rods
1993 E. L. Korotkikh
Determining the optimal match between the average and instantaneous loads of mining machines
1993 A. M. Meshkov
Rational mechanical characteristic of the carriage feed drive of the AMS unit
1993 Yu. V. Lykov
Theoretical studies of parameters of a walking landing gear with a movable float
1993 I. P. Timofeev, N. K. Ulashchik