Submit an Article
Become a reviewer
Vol 138
Pages:
79-83
Download volume:
RUS
Article

Analysis of 4PP-2M roadheader operation at Lenmetrostroy mine № 516

Authors:
A. A. Khalilov
Date submitted:
1992-09-25
Date accepted:
1992-11-29
Date published:
1993-12-28

Abstract

The technology of construction of single-wall stations of the St. Petersburg Metro provides for the development of the station core, which contains the bulk of the rock excavated during the construction of the station, after the construction of the upper vault. Until recently, this work was carried out mainly with the help of jackhammers.

Область исследования:
(Archived) Without section
Go to volume 138

Similar articles

Theoretical studies of parameters of a walking landing gear with a movable float
1993 I. P. Timofeev, N. K. Ulashchik
Improvement of gear hydraulic machines by meshing geometry
1993 S. L. Ivanov, I. P. Ivanov, O. A. Krasnozhon
Existence area of spur gear meshing with a given overlap coefficient
1993 S. L. Ivanov
Method of calculation of vector dimension chains
1993 A. P. Batalov
Rational mechanical characteristic of the carriage feed drive of the AMS unit
1993 Yu. V. Lykov
Mechanization schemes for creating protective coatings on bulk material bunches
1993 P. F. Korsakov