Submit an Article
Become a reviewer
Vol 138
Pages:
79-83
Download volume:
RUS
Article

Analysis of 4PP-2M roadheader operation at Lenmetrostroy mine № 516

Authors:
A. A. Khalilov
Date submitted:
1992-09-25
Date accepted:
1992-11-29
Date published:
1993-12-28

Abstract

The technology of construction of single-wall stations of the St. Petersburg Metro provides for the development of the station core, which contains the bulk of the rock excavated during the construction of the station, after the construction of the upper vault. Until recently, this work was carried out mainly with the help of jackhammers.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 138

Similar articles

К вопросу о производительности щековой дробилки
1993 V. V. Denegin
Existence area of spur gear meshing with a given overlap coefficient
1993 S. L. Ivanov
To the issue of studying the loading of resilient systems of dump trucks in the process of movement
1993 N. V. Zyryanov, V. Yu. Koptev
Calculation of connections with guaranteed interference fit for a given probability of failure-free operation
1993 E. S. Kuznetsov
Methods of determining the service life of mining equipment
1993 M. D. Kolomiytsov, B. S. Makhovikov
Theoretical studies of parameters of a walking landing gear with a movable float
1993 I. P. Timofeev, N. K. Ulashchik