Submit an Article
Become a reviewer
Vol 148 Iss. 2
Pages:
90-95
Download volume:
RUS
Article

Development of devices in the modernized technology of drilling and blasting operations for joint mining of ore and ornamental granite in the contours of a common pit

Authors:
S. K. Rubtsov
About authors
  • VNIPIpromtechnologii
Date submitted:
2000-07-09
Date accepted:
2000-08-17
Date published:
2001-12-21

Abstract

Improvement of efficiency of mining production is directly connected with increase of a degree of use of extracted from a subsoil both the basic and jointly developed or by-product minerals. Application of mass explosions at open-cast mining causes the necessity to protect the sites of jointly developed or nearby deposits from harmful seismic-explosive effects.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Quality of rock blasting as the basis of profitability of a crushed stone plant
2001 Yu. I. Vinogradov, A. G. Zatonskikh
Experimental studies on ice cutting
2001 N. I. Vasilev, V. M. Zubkov
Priority areas for the development of the coal, ore and construction oil mining industry by open pit mining to improve blasting methods
2001 B. N. Kutuzov
Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia
2001 I. V. Mashukov, A. N. Topkaev, G. V. Goltsov, V. N. Nikitin, Yu. M. Karapetyan, V. K. Dzhalov, P. A. Filippov
Improvement of blasting operations at quarries in the south of Kuzbass
2001 I. V. Timoshin, A. V. Zykov
The degree of impact of crushing quality on the energy intensity of technological processes in the production of crushed stone
2001 A. I. Arsentev, O. N. Talamanova