Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits
About authors
- 1 — Moscow Mining University
- 2 — Moscow Mining University
Abstract
The water cut of working benches in ore pits does not allow the wide use of the simplest types of explosives and causes the necessity of using water-resistant explosives, which significantly increases the cost of blasting operations. In cases when granulotols are used in watered boreholes, there is a very significant environmental load due to increased toxicity of explosion products and high dust-forming ability.
References
- Пат. 2154254 РФ. Способ производства взрывных работ на карьерах / Г.Г. Каркашазе, А.И. Перепелицын, В.И. Мочалов, В.В. Коломоец, Ю.М. Рудской, Н.И. Мачулин. ОАО "Михайловский ГОК" и Московский Горный университет. Приоритет 13.10.1999.
Similar articles
Electro-pulse method of rock fracturing and drilling wells
2001 D. V. Zhgun, V. F. Vazhov, M. Yu. Zhurkov
Development of rational constructions of vertical concentrated explosive charges for mass destruction of ore
2001 A. A. Eremenko, I. V. Mashukov, S. F. Fefelov
Priority areas for the development of the coal, ore and construction oil mining industry by open pit mining to improve blasting methods
2001 B. N. Kutuzov