Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits

Authors:
G. G. Karkashadze1
N. O. Taran2
About authors
  • 1 — Moscow Mining University
  • 2 — Moscow Mining University
Date submitted:
2000-07-08
Date accepted:
2000-08-11
Date published:
2001-02-01

Abstract

The water cut of working benches in ore pits does not allow the wide use of the simplest types of explosives and causes the necessity of using water-resistant explosives, which significantly increases the cost of blasting operations. In cases when granulotols are used in watered boreholes, there is a very significant environmental load due to increased toxicity of explosion products and high dust-forming ability.

Go to volume 148

References

  1. Пат. 2154254 РФ. Способ производства взрывных работ на карьерах / Г.Г. Каркашазе, А.И. Перепелицын, В.И. Мочалов, В.В. Коломоец, Ю.М. Рудской, Н.И. Мачулин. ОАО "Михайловский ГОК" и Московский Горный университет. Приоритет 13.10.1999.

Similar articles

Quality of rock blasting as the basis of profitability of a crushed stone plant
2001 Yu. I. Vinogradov, A. G. Zatonskikh
Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia
2001 I. V. Mashukov, A. N. Topkaev, G. V. Goltsov, V. N. Nikitin, Yu. M. Karapetyan, V. K. Dzhalov, P. A. Filippov
Intensity based on seismic scale, vibration velocity and distance reduction in blasting
2001 V. Kh. Pergament, Yu. E. Ovcharov, E. V. Goncharov
Development of an effective method of dust suppression for mass explosions in mining pits
2001 G. G. Karkashadze, I. V. Novikov
Theoretical basis of an express method of explosive fracture assessment based on seismic signal parameters
2001 S. V. Lukichev
Expert system of seismic safety of blasting operations
2001 V. A. Belin, D. K. Potresov, N. I. Bukhanova