Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits

Authors:
G. G. Karkashadze1
N. O. Taran2
About authors
  • 1 — Moscow Mining University
  • 2 — Moscow Mining University
Date submitted:
2000-07-08
Date accepted:
2000-08-11
Date published:
2001-12-21

Abstract

The water cut of working benches in ore pits does not allow the wide use of the simplest types of explosives and causes the necessity of using water-resistant explosives, which significantly increases the cost of blasting operations. In cases when granulotols are used in watered boreholes, there is a very significant environmental load due to increased toxicity of explosion products and high dust-forming ability.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Development of technical means to improve the safety of blasting operations in mines, hazardous in gas and dust
2001 Yu. V. Gorlov
Influence of explosion energy on the quality of rough diamonds
2001 A. T. Vedin, V. Ya. Konovalenko
Principle of database construction for the expert system of seismic safety of blasting operations
2001 V. A. Belin, D. K. Potresov, A. D. Lvov
Combined technology for ore-bed breaking with concentrated and beam charges
2001 A. A. Eremenko, I. V. Mashukov, G. P. Ermak, S. V. Fefelov
Damping plate parts test of the moving cover
2001 E. B. Shevkun, N. A. Leonenko
Investigation of fracture processes of composites with hybrid spatially reinforced weighting material
2001 G. E. Freger, V. P. Tatsienko, V. M. Buchatskii