Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits

Authors:
G. G. Karkashadze1
N. O. Taran2
About authors
  • 1 — Moscow Mining University
  • 2 — Moscow Mining University
Date submitted:
2000-07-08
Date accepted:
2000-08-11
Date published:
2001-12-21

Abstract

The water cut of working benches in ore pits does not allow the wide use of the simplest types of explosives and causes the necessity of using water-resistant explosives, which significantly increases the cost of blasting operations. In cases when granulotols are used in watered boreholes, there is a very significant environmental load due to increased toxicity of explosion products and high dust-forming ability.

Область исследования:
(Archived) Without section
Go to volume 148

Similar articles

Principle of database construction for the expert system of seismic safety of blasting operations
2001 V. A. Belin, D. K. Potresov, A. D. Lvov
Improvement of blasting operations at quarries in the south of Kuzbass
2001 I. V. Timoshin, A. V. Zykov
Development of devices in the modernized technology of drilling and blasting operations for joint mining of ore and ornamental granite in the contours of a common pit
2001 S. K. Rubtsov
Justification of rational arrangement of the grid of rupture holes formed during explosive fracture to improve the quality of the pelletizing process based on the superposition of dynamic stress in two-dimensional space
2001 A. G. Fedorov
Theoretical fundamentals of ice drilling using a relief slot
2001 A. M. Shkurko
Quality of rock blasting as the basis of profitability of a crushed stone plant
2001 Yu. I. Vinogradov, A. G. Zatonskikh