Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits

Authors:
G. G. Karkashadze1
N. O. Taran2
About authors
  • 1 — Moscow Mining University
  • 2 — Moscow Mining University
Date submitted:
2000-07-08
Date accepted:
2000-08-11
Date published:
2001-12-21

Abstract

The water cut of working benches in ore pits does not allow the wide use of the simplest types of explosives and causes the necessity of using water-resistant explosives, which significantly increases the cost of blasting operations. In cases when granulotols are used in watered boreholes, there is a very significant environmental load due to increased toxicity of explosion products and high dust-forming ability.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Problems of environmental safety monitoring at blasting sites
2001 N. N. Aleinikov, N. N. Vershinin, K. K. Shvedov
Perspectives for intensification of operation of mining pits on the basis of environmental safety requirements
2001 A. S. Derzhavets, V. I. Romanov, O. I. Khokhlov
Damping plate parts test of the moving cover
2001 E. B. Shevkun, N. A. Leonenko
Calculation of rational parameters of fracture of frozen soils during the construction of excavations of given dimensions
2001 I. I. Drozd
Theoretical basis of an express method of explosive fracture assessment based on seismic signal parameters
2001 S. V. Lukichev
Specifics of drilling flowing wells in intervals of unstable formations
2001 N. I. Nikolaev, E. Yu. Tsygelnyuk, N. S. Konokotov, N. A. Shatov