Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits
About authors
- 1 — Moscow Mining University
- 2 — Moscow Mining University
Abstract
The water cut of working benches in ore pits does not allow the wide use of the simplest types of explosives and causes the necessity of using water-resistant explosives, which significantly increases the cost of blasting operations. In cases when granulotols are used in watered boreholes, there is a very significant environmental load due to increased toxicity of explosion products and high dust-forming ability.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Development of an effective method of dust suppression for mass explosions in mining pits
2001 G. G. Karkashadze, I. V. Novikov
Problems of environmental safety monitoring at blasting sites
2001 N. N. Aleinikov, N. N. Vershinin, K. K. Shvedov
Development of sealing and lubrication systems for bearings of high-speed roller bits
2001 Yu. G. Matveev, A. N. Popov, R. A. Ismakov, O. G. Blinkov, A. I. Moguchev, Yu. I. Samokhodov
Improvement of blasting operations at quarries in the south of Kuzbass
2001 I. V. Timoshin, A. V. Zykov