Development of rational constructions of vertical concentrated explosive charges for mass destruction of ore

Authors:
A. A. Eremenko1
I. V. Mashukov2
S. F. Fefelov3
About authors
  • 1 — Institute of Mining Engineering SB RAS
  • 2 — OAO VOSTNIGRI
  • 3 — OAO Zapsibcombinat
Date submitted:
2000-07-25
Date accepted:
2000-08-24
Date published:
2001-02-01

Abstract

In the practice of blasting in the mining industry during mining of minerals by underground mining for crushing the rock mass, borehole charges of explosives, as well as borehole and stone (mine) charges located in the chambers, tunnels and mine wells are used. The largest volume of rock mass removal is currently carried out by borehole explosive charges. Mines in Gornaya Shoria, Khakassia and the Urals use the technology of stripping by bundles of parallel-conjugated borehole charges.

Go to volume 148

Similar articles

Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia
2001 I. V. Mashukov, A. N. Topkaev, G. V. Goltsov, V. N. Nikitin, Yu. M. Karapetyan, V. K. Dzhalov, P. A. Filippov
Perspectives for intensification of operation of mining pits on the basis of environmental safety requirements
2001 A. S. Derzhavets, V. I. Romanov, O. I. Khokhlov
Damping plate parts test of the moving cover
2001 E. B. Shevkun, N. A. Leonenko
Scientific and practical issues of core preservation technology developed by VITR
2001 V. A. Kaulin, P. P. Ponomarev
The degree of impact of crushing quality on the energy intensity of technological processes in the production of crushed stone
2001 A. I. Arsentev, O. N. Talamanova
Experimental studies on ice cutting
2001 N. I. Vasilev, V. M. Zubkov