Development of rational constructions of vertical concentrated explosive charges for mass destruction of ore

Authors:
A. A. Eremenko1
I. V. Mashukov2
S. F. Fefelov3
About authors
  • 1 — Institute of Mining Engineering SB RAS
  • 2 — OAO VOSTNIGRI
  • 3 — OAO Zapsibcombinat
Date submitted:
2000-07-25
Date accepted:
2000-08-24
Date published:
2001-02-01

Abstract

In the practice of blasting in the mining industry during mining of minerals by underground mining for crushing the rock mass, borehole charges of explosives, as well as borehole and stone (mine) charges located in the chambers, tunnels and mine wells are used. The largest volume of rock mass removal is currently carried out by borehole explosive charges. Mines in Gornaya Shoria, Khakassia and the Urals use the technology of stripping by bundles of parallel-conjugated borehole charges.

Область исследования:
(Archived) Without section
Go to volume 148

Similar articles

Issues in mechanical ice drilling
2001 I. G. Shelkovnikov
Problems of environmental safety monitoring at blasting sites
2001 N. N. Aleinikov, N. N. Vershinin, K. K. Shvedov
Specifics of drilling flowing wells in intervals of unstable formations
2001 N. I. Nikolaev, E. Yu. Tsygelnyuk, N. S. Konokotov, N. A. Shatov
Development of devices in the modernized technology of drilling and blasting operations for joint mining of ore and ornamental granite in the contours of a common pit
2001 S. K. Rubtsov
Expert system of seismic safety of blasting operations
2001 V. A. Belin, D. K. Potresov, N. I. Bukhanova
Development of sealing and lubrication systems for bearings of high-speed roller bits
2001 Yu. G. Matveev, A. N. Popov, R. A. Ismakov, O. G. Blinkov, A. I. Moguchev, Yu. I. Samokhodov